Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work for a water / sewer project in Chester, Montana. Conceptual plans call for site work for a water / sewer project.

Removal of the spillway gantry crane at Tiber Dam, including the complete removal of all crane components such as the crane frame, bridge, hoist, rail, and rail support beams and columns. All connections to concrete decks and piers shall be removed using methods that minimize damage to existing concrete, with all embedded anchors left flush with the concrete surface and all concrete left in place. All removed materials shall be loaded, hauled, and legally disposed of off site, with the option for the contractor to salvage materials at their discretion. After crane removal, the contractor shall install and remove government-furnished stoplogs in each of the three spillway gate bays, maintaining each stoplog set in place for one working day to allow operational testing of the radial gates. Only one full set of stoplogs is available and must be moved between bays, and all stoplogs shall be returned to the storage area near the spillway upon completion. The contractor shall provide all management, supervision, labor, subcontractors, materials, supplies, and equipment needed to plan, schedule, coordinate, and complete all services. Work shall commence within 10 calendar days of the Notice to Proceed, be completed within 30 calendar days of receipt of the Notice to Proceed, and be performed Monday through Thursday between 7:00 AM and 5:30 PM, excluding nights, federal holidays, and Sundays. Work is permitted only between April 1 through June 1 and August 15 through November 1 unless otherwise approved. Location: Tiber Dam Liberty County, near Chester, Montana Nearest mailing address: Marias River - Tiber Dam Recreation Area, 42 Tiber Dam Road, Chester, MT 59522 The estimated magnitude for this project is between $25,000 and $100,000. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Water / Sewer

$100,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2027

Project location map

To Be Determined, Chester, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.