BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2023 at 7:00 PM

Updated January 27, 2024

Site work and paving for a mixed-use development in Fox Lake, Wisconsin. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing The work for which bids are asked includes the following: Removals: excavation common, electrical, landscaping, existing asphalt parking lot and tree removal. Erosion Control: Erosion mat, turbidity barrier, silt fence, sediment logs, and stormwater swales. Site Improvements: Concrete sidewalk improvements, asphalt parking lot paving and repair, ADA accessible canoe kayak launch, ADA accessible fishing pier, park benches, picnic tables, preliminary setup for ADA playground, free standing drinking fountain and seawall modification. Electrical: Electrical service, and underground conduit. Utilities: Sanitary sewer force main service and grinder pump, and water line Buildings: 1) Prefabricated Concrete Restroom: purchase and installation, including foundation and, associated site utilities. 2) Existing Shelter Upgrades: Concrete sidewalk around shelter, new doors and windows, and other updates. (Additive Alternate) Site and Turf Restoration: Site and turf restoration. General site clean-up and amenities installed. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The work for which bids are asked includes the following: Removals: excavation common, electrical, landscaping, existing asphalt parking lot and tree removal. Erosion Control: Erosion mat, turbidity barrier, silt fence, sediment logs, and stormwater swales. Site Improvements: Concrete sidewalk improvements, asphalt parking lot paving and repair, ADA accessible canoe kayak launch, ADA accessible fishing pier, park benches, picnic tables, preliminary setup for ADA playground, free standing drinking fountain and seawall modification. Electrical: Electrical service, and underground conduit. Utilities: Sanitary sewer force main service and grinder pump, and water line Buildings: 1) Prefabricated Concrete Restroom: purchase and installation, including foundation and, associated site utilities. 2) Existing Shelter Upgrades: Concrete sidewalk around shelter, new doors and windows, and other updates. (Additive Alternate) Site and Turf Restoration: Site and turf restoration. General site clean-up and amenities installed Pursuant to Section 66.0903, Wisconsin Statutes, the minimum wages to be paid on the project shall be in accordance with the wage rate scale established by Local wage rates. OWNER reserves the right to waive any informalities or to reject any or all bids. CONSULTING ENGINEER: MSA Professional Services, Inc. 1230 South Boulevard Baraboo, WI 53913 Marcus Rue, P.E. (608) 355-8917

Award

Playgrounds / Parks / Athletic Fields

$609,643.00

Public - City

Paving, Site Work

24

17

10

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
105
Bidding Soon
1,372
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 9, 2023

January 8, 2024

Project location map

Hamilton and N Collage Avenue, Fox Lake, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.