BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2024 at 8:00 PM

Updated May 10, 2024

Site work and paving for a detention facility in Fox Lake, Wisconsin. Completed plans call for site work for a detention facility; and for paving for a detention facility.

As of May 9,2024, this project has not yet been awarded. A timeline for award has not yet been established. In general, the work consists of: removing existing asphalt pavement, removing and replacing existing driveway culvert, placing base course, new hot mix asphalt pavement, pavement marking, and other incidentals required to complete the work. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin’s prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply.

Bid Results

Jails / Prisons

$114,980.00

Public - State/Provincial

Paving, Site Work

10

16

7

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
106
Bidding Soon
1,364
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

May 27, 2024

Project location map

To Be Determined, Fox Lake, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.