BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Claxton, Georgia. Completed plans call for site work for a transportation facility.

As of January 3, 2024 this project was awarded to Awarded to Adams-Warnock, Inc with the awarded amount of $503,394.85. The project will consist of the construction of 1500 LF of rail, the rerouting of water and gas main along Bill Hodges Road, construction of an access road to the Phase 1 rail extension including, but not limited to, installation of 271 LF of 8" water main, 25 LF of 2" water line, and 116 LF of natural gas main. The project will further consist of erosion and sediment control, and grassing. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. Time allotted for completion of work is one hundred eighty (180) calendar days. Owner reserves the right to reject any or all Bids and to waive informalities Question Deadline 11/22/2023 All questions about the meaning or intent of the Bidding Documents are to be directed to Engineer.

Award

Transportation Terminals

$503,395.00

Public - City

Site Work

3

15

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
20
Bidding Soon
349
All Active Projects
146
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 29, 2023

February 12, 2024

img_map_placeholder

Multiple Locations, Claxton, GA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.