BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Brimfield, Illinois. Completed plans call for site work for a water / sewer project.

Location: Jubilee College State Park 13921 West Route 150 Brimfield, Il 61517 Project Narrative: Jubiliee College State Park is Owned and Operated by the Illinois Department of Natural Resources (Dnr) in Peoria County. The Existing Well Serving Potable Water to the Office and Maintenance Buildings Has Failed. Repair of the Well or Drilling a New Well in the Same Location Are Not Practical or Cost-effective Options, However a Second Existing Well is Located at a Shelter Area Relatively Nearby. Dnr is Seeking Bids to Restore Water Service to the Office and Maintenance Buildings by Installing a New Waterline From Well House #2 to the Well #1 Location. Scope of Work: This Project Will Include the Sealing of the Existing Well, Rehabilitating the Plumbing and Wiring in Well House #2, Installing a New 1 1/2 " Hdpe Water Line From Well House #2 to Well #1, Site Restoration and Erosion Control. See Special Provisions and Plans. Attachments: The Following Documents Are Included: 1) Plans 2) Special Provisions 3) Idph Permit Forms 4) Contractor Schedule of Values Form Project Specifications & Requirements: A Licensed Well Driller Contractor Must Handle the Closure of Well #1. Herein After the Terms "Owner", "ownership", "department", "Engineer", or Any Derivatives of Such, Shall Mean the Illinois Department of Natural Resources or Its Designated Representative and the Term "Contractor" Shall Mean the Entity Who Proposes to Perform the Work Herein Described or Its Designated Subcontractors. Once All Construction is Complete, the Contractor is Required to Clean-up and Dispose of All Construction Debris at an Authorized Off-site Disposal Facility. Project Specifications: 1) Construction Inspection Any Work Performed Without the Presence of an Owner's Designated Representative to Inspect Said Construction Shall Not Be Accepted for Payment as Directed by the Owner. Contractor Shall Notify Ownership a Minimum of 24 Hours in Advance of the Start of Construction or the Continuation of Construction Following a Pause in Work. 2) if, in the Opinion of the Contractor, Any Part of the Specifications or Drawing(S) Does Not Comply With the Laws, Codes, Regulations, and Specifications; That Matter Shall Be Referred to the Attention of the Architect/engineer for a Decision Before Proceeding With That Part of the Work. There Shall Be No Changes in the Drawing(S) and Specifications Made Without the Approval of the Architect/engineer. Questions All Questions Pertaining to the Scope of Work or the Bidbuy Procedures, Must Be Directed to Frederick.murphy@illinois.gov All Questions Must Be Submitted in Writing No Later Than Three (3) Business Days Before the Bid Date. Project Contacts: the Following Individuals Are Listed as Project Contacts During the Construction Phase. The Bidder May Not Communicate Directly With Any of These Individuals During the Bidding Process. All Communication During the Bidding Phase Must Be Directed to the Frederick.murphy@illinois.gov Email Address.

Post-Bid

Water / Sewer

$500,000.00

Public - State/Provincial

Site Work

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
61
Bidding Soon
929
All Active Projects
397
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 21, 2023

December 21, 2023

June 30, 2024

img_map_placeholder

13921 W Rte 150, Brimfield, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.