BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a clubhouse / community center in Bloomsburg, Pennsylvania. Completed plans call for the renovation of a clubhouse / community center.

Work for the Project shall be accomplished by a Separate Prime Contractors according to Pennsylvania statute and shall include, but not be limited to, the following: Commonwealth University - Bloomsburg Campus of the PA State System of Higher Education invites General Contractors, Mechanical and Electrical Contractors to download bid documents for this project. Work includes but not limited to construction required includes all work as shown on the drawings and included in the contract documents for the Interior renovations to support replacement of two (2) motorized operable partitions at Kehr Union Building (KUB) at Commonwealth University of Pennsylvania - Bloomsburg Campus. The Work generally includes installation of structural steel support framing, new interior partitions, doors and finishes and associated modification of existing mechanical, electrical and fire protection systems. Work identified under Alternate No. 1 includes replacement of recessed downlights located within an existing acoustical panel ceiling. Operable partitions will be provided under separate contract and installed by Owner's separate contractor in conjunction with the performance of work under this Project. Contract Cost Ranges: SSHE-82-CWU-25-B.1: General contractor: $180,000 - $190,000 SSHE-82-CWU-25-B.2: Mechanical/PP contractor: $ 18,000 - $ 20,000 SSHE-82-CWU-25-B.3: Electrical contractor: $ 22,000 - $ 25,000 Total: $220,000 - $235,000 Work shall be accomplished by a Separate Prime Contractors according to Pennsylvania statute. The Lead Prime Contractor shall be the General Construction Contractor and shall include, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all construction identified on the Contract Documents to the satisfaction of, and subject to approval of the Professional and the University. Cut-off Date for Pre-Bid Questions: November 28, 2023 by 12:00 PM, EST

Award

Clubhouse / Community Centers

$338,390.00

Public - State/Provincial

Renovation

10

21

10

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
83
Bidding Soon
1,185
All Active Projects
539
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2023

May 13, 2024

img_map_placeholder

400 E 2nd St, Bloomsburg, PA


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.