BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Seattle, Washington. Contact the soliciting agency for additional information.

THIS AGREEMENT, made and entered into by and between the parties specified in Section 1, Agreement Summary, collectively referred to as "Parties", shall be effective upon the authorized signatures of both Parties to this Agreement on the date last signed below ("Effective Date"). The Consultant agrees to perform professional services as required by the County in accordance with the terms and conditions contained herein. A description of the services to be performed are set forth in Exhibit A, Scope of Work. PERIOD OF PERFORMANCE A. All required work and services specified in the terms and conditions of this Agreement for phase one, shall be completed by the Completion Date specified in Section 1, Agreement Summary unless extended or terminated earlier by the County pursuant to the terms and conditions of this Agreement. The County reserves the right to amend this Agreement to add future phases. The County also reserves the right to let the Agreement expire at the completion of phase one and to select another consultant to perform the additional study and/or phases. B. Time. Time is a material consideration in the performance of all work by the Consultant under this Agreement. The Consultant shall complete its work and services within the project schedule, including any established milestones and task completion dates, and the Period of Performance, set forth in the Scope of Work. The completion dates for tasks may be modified by a written directive; however, the Period of Performance for the Agreement may only be modified through an amendment. The Period of Performance and Contract milestones shall not be extended because of any unwarranted delays attributable to the Consultant. The Period of Performance and Contract milestones may be extended in the event of a delay caused by the County which results in a delay in the performance of an affected task, because of unavoidable delay caused by any governmental action, or other conditions beyond the control of the Consultant, which could not be reasonably anticipated, and which results in a delay in the Period of Performance and Contract milestones. C. The Total Price, Fixed Professional Fee, Period of Performance, and task budgets shall not be increased because of any unwarranted delays or costs attributable to the Consultant. In the event of a delay not attributable to the Consultant which (1) delay could not be reasonably anticipated and (2) results in an increase in costs to perform the work, the County may, through the execution of an amendment, adjust the Total Price, Period of Performance and/or task budget in accordance with the provisions of the Agreement. . Address questions related to these provisions by contacting King County Business Development and Contract Compliance (BDCC) Section via email at opportunity@kingcounty.gov. Please include the contract number in all correspondence.

Post-Bid

Water / Sewer

Public - County

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
30
Bidding Soon
902
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 8, 2024

February 7, 2024

img_map_placeholder

Multiple Locations, Seattle, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.