BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Renton, Washington. Completed plans call for the renovation of a 327,500-square-foot educational facility.

Questions: Jesse Favia, jessef@formacc.com, 360-754-5788 Hazen High School is an approximately 327,500 sq. ft. building with a total of nine existing science classrooms in the school facility. Seven of the science classrooms, four on the first floor and three on the second floor, are in the northeast classroom wing constructed in 1967. The remaining two science classrooms are in a two-story classroom addition constructed in 2011. The northwest classroom wing is a one-story building consisting of Art, Career and Technical Education (CTE), and sports medicine programs. The northeast classroom wing is a two-story building consisting of administration offices, general classrooms, and science classrooms. The two classroom wings, gym, swimming pool, and commons are cast-in-place concrete, and masonry structural system constructed in 1967. The 2011 addition is a two-story structural steel building that connects the northeast and northwest classroom wings, gym, and commons. The auditorium next to the commons was constructed in 2000 which is a structural steel and CMU construction type. The project is anticipated to include the following scope: o Refresh of all interior spaces of the approximately 327,500 sq. ft. building, not including the natatorium or associated natatorium spaces. Refresh will include paint, flooring, casework, etc. o Modernization of nine existing science classrooms and associated spaces. Conversion of three existing general education classrooms to one new science classroom and one new general education classroom. o Seismic upgrades of the entire building, including the natatorium and associated natatorium spaces. o Replacement of existing roof system with new roof system meeting current energy code. o Addition of new secure entry vestibule at the main office entrance. Replacement of existing HVAC and steam heating systems with new building wide heating/cooling systems. o Conversion of existing domestic hot water system to a centralized distribution system. The currently estimated maximum allowable construction cost (MACC) is $ 54,000,000. The project will occur on an occupied high school campus and include the complexities of phased permits and construction. FORMA and RSD require a electrical partner that has experience and expertise in phased construction on an occupied site. The electrical contractor firm should also be knowledgeable and skilled at developing student/staff safety plans, working within existing structural, HVAC, and Electrical systems, and providing temporary provisions for continued operation of the building. Preliminary design and construction schedule: January 2024 MCCM Selection January 2024 ECCM Selection November 2023 - April 2024 Schematic Design April 2024 - August 2024 Design Development August 2024 - February 2025 Permitting August 2024 - October 2024 Early Bid and Procurement November 2024 - February 2025 Construction Documents February 2025 - April 2025 Subcontractor Bidding & Negotiate GMP/MASC June 2025 - March 2028 Phased Construction The currently estimated maximum allowable subcontract cost (MASC) is $9,093,000. FORMA reserves the right to waive minor informalities or irregularities in any submittal

Post-Bid

Educational

Public - City

Renovation

5

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
30
Bidding Soon
885
All Active Projects
384
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 8, 2023

June 2, 2025

img_map_placeholder

1101 Hoquiam Ave NE, Renton, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.