Black Friday through Cyber Monday: Get 10% off Project Intelligence

See pricing

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 2, 2024 at 7:00 PM

Updated June 29, 2024

Site work for a water / sewer project in Ellensburg, Washington. Completed plans call for site work for a water / sewer project.

Site Directions: 4731 Kittitas Highway, Ellensburg WA 98926 The Coleman Creek RM 4.4 Fish Passage Improvements project will remove a concrete gravity irrigation diversion structure, install a new concrete structure with a fish screen and spray bar cleaning system, provide a roughened channel instream, and install piping and pump to connect to an existing irrigation system. Est. Value: $ 450,000.00 Est. Completion Date: March 15, 2024

Award

Water / Sewer

$513,871.00

Public - County

Site Work

27

33

47

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
47
Bidding Soon
748
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2023

January 10, 2024

Project location map

4731 Kittitas Hwy, Ellensburg, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed