BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 24, 2024 at 7:00 PM

Updated January 29, 2024

Site work and paving for a bridge / tunnel in New Bothwell, Manitoba. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Construction of a three span continuous box girder structure over Manning Canal on PR 311 and associated channel and road works, located 12km west of Blumenort, within the Rural Municipality of Hanover, Province of Manitoba, Bridge Site No. 3552-10. Question Acceptance Deadline: 2023/12/15 12:00:00 PM CST Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Bridges / Tunnels

$8,999,928.00

Public - State/Provincial

Paving, Site Work

63

3

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
51
Bidding Soon
522
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2023

January 22, 2024

Project location map

MB-311, New Bothwell, MB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.