BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Seattle, Washington. Completed plans call for the renovation of a road / highway; and for site work for a road / highway.

Work generally includes installation of a temporary bypass pipe from the pump station to the north end of the project; replacement of the twin 36-inch diameter steel forcemains with 42-inch ductile iron pipe; construction of an odor control facility (OCF) and access road at the forcemain discharge structure (FMDS); and rehabilitation of the twin 48-inch forcemains, the forcemain discharge structure, and the Elliott Bay Interceptor Section 8 (EBI 8) from the forcemain discharge structure to the maintenance hole located near the north side of the golf course. Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Contract Specialist: Trisha Roth, troth@kingcounty.gov, 206-263-1964 Alternate Contract Specialist: Melissa Jordan, mejordan@kingcounty.gov, 206-263-4005 : Mobilization/demobilization, demolition and salvage, erosion and sediment control, traffic control, excavation, trenching and backfill, temporary sewer bypass pump and piping, temporary water bypass, geopolymer pipe lining, cast-in-place concrete, CIPP pipe rehabilitation, building foundations, masonry, roofing, doors and finishes, painting, mechanical, plumbing, electrical, instrumentation and controls, building structural steel, storm utility piping, sewer utility piping, water utility piping, testing and commissioning, roadway restoration, retaining walls, and landscaping Priority Hire Apprentice Utilization Goal: 27% of the total Apprentice Labor Hours worked during the contract. Priority Hire Journey Level Goal: 18% of the total Journey Labor Hours worked during the contract.

Award

Water / Sewer

$51,819,412.00

Public - County

Renovation, Site Work

1

18

504

3

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
87
Active Projects
48
Bidding Soon
901
All Active Projects
333
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2024

May 10, 2024

img_map_placeholder

To Be Determined, Seattle, WA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.