Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 24, 2025 at 8:00 PM
Updated September 25, 2025
Site work and paving for a mixed-use development in Maryville, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
HMA resurfacing with sidewalks, driveways, curb and gutter on Keebler Road from Sher Nan Drive to West Main Street in Maryville Region 5 District 8 Federal Project # JU3S(117) County(s) Madison Key Route(s)FAU 9135 Marked Route(s) Keebler Road Section(s) 20-00018-02-RS (MARYVILLE) State Job #(s) C-98-015-24 PPS #(s) 8-10760-0000 Contract Specifics 40 Working Days Questions not accepted as of July 22, 2025 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, December 29, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. LOCATION OF PROJECT This project is located within the Village of Maryville along Keebler Road. The project extends northerly 1580.00 feet from approximately 80 feet north of West Main Street to approximately 120 feet north of Sher Nan Drive. DESCRIPTION OF WORK This project consists of furnishing all labor, equipment and materials necessary to construct a new asphalt pavement surface course and 6' wide sidewalks on both sides of the roadway. Items of work for Keebler Road Resurfacing Phase 3 include but are not limited to: Variable hot-mix asphalt surface removal, 3" hot-mix asphalt surface course, concrete sidewalk, driveways, curb and gutter around driveways, and all other collateral items necessary to complete the work as shown in the plans. Items of work for the side road (Sher Nan Drive) include but are not limited to: 6" pavement removal, 6" hot-mix asphalt surface course, gutter removal, special gutter and all other collateral items necessary to complete the work as shown in the plans. JOINT UTILITY LOCATING INFORMATION FOR EXCAVATORS (J.U.L.I.E.) The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 067 - HMA Resurfacing With Sidewalks, Driveways, Curb and Gutter on Keebler Road From Sher Nan Drive to West Main Street in Maryville
Award
Roads / Highways
$829,420.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 1, 2025
September 1, 2025
Keebler Rd, Maryville, IL
Related To This Project
Maryville, IL
Bid Date: Mar 08 2024
Maryville, IL
Bid Date: May 28 2024
Maryville, IL
Bid Date: Jun 10 2024
Maryville, IL
Bid Date: Dec 05 2024
Maryville, IL
Bid Date: Feb 26 2025
Maryville, IL
Bid Date: Sep 04 2025
Maryville, IL
Bid Date: Oct 03 2025
Maryville, IL
Bid Date: Dec 01 2025
Maryville, IL
Bid Date: Feb 03 2022
Maryville, IL
Bid Date: Jan 14 2021
Maryville, IL
Bid Date: Jun 12 2023
Maryville, IL
Bid Date: Feb 16 2023
Maryville, IL
Bid Date: Feb 16 2023
Maryville, IL
Bid Date: Dec 02 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
