BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Yogo Crossing, Montana. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Project: MT FLAP VALLEY 20(1), Duck Creek Road This project consists of work on 4.85 miles of gravel road in Valley County, Montana. The project begins at the intersection of Duck Creek Road with Montana Secondary Highway 24, approximately fifteen (15) miles southeast of Glasgow, Montana. The project work consists of three discrete segments for upgrades, as follows: Segment 1 (milepost 0.0 to 1.1) - reconstruct & widen deteriorated asphalt roadway from 24' to 28' with new asphalt to better accommodate RV/Boat/truck traffic and pedestrians; segment 2 (milepost 1.1 to 2.6) - maintain 30' width and resurface with 6" of gravel with dust palliative. Reduce existing steep grade for better RV/truck/boat traffic safety; and segment 3 (milepost 2.6 to 4.85) - surface reconditioning and aggregate surface placement. The work includes drainage, roadway reconditioning, asphalt surfacing, aggregate surfacing, aggregate stabilization, pavement markings and signage. The primary objective of the proposed contract is to recondition and resurface the existing gravel road, replace worn and failing asphalt surfacing where present, repair the existing roadway drainage and repair or replace existing roadside safety signs. In addition to new asphalt in the first 1.10 miles, new aggregate and calcium chloride to improve and stabilize the roadway surface in the gravel sections will be realized. Contract award is anticipated by January 2025. The estimated period of performance will consist of a notice to proceed in March 2025 and a fixed completion in October 2025. The Method of Contractor Selection has not been determined at this Time. Estimated Price Range: $5 -$10 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$10,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
5
Bidding Soon
16
All Active Projects
11
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2025

img_map_placeholder

Multiple Locations, Yogo Crossing, MT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.