BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published January 19, 2024 at 7:00 PM

Updated January 29, 2024

Site work and paving for a civil project in Yogo Crossing, Montana. Conceptual plans call for site work for a bridge / tunnel; road / highway; and for paving for a road / highway.

The scope of this project is to Rehabilitate the Many Glacier Road within Glacier National Park, from the Hotel Intersection to Swiftcurrent Motor Inn, Route 0014. Redevelop will include rehabilitated roadway pavement structure, culverts, sub-excavations and new pavement structure at three parking areas, signage, and barrier rock placement. This 2-mile project includes, rehabilitation of the existing pavement surface with an inlay/overlay treatment, 8 culvert replacements, two fully reconstructed parking lots, one new roadside parking area, signage, striping, barrier rock placement, and campground loop surfacing pulverization, grading, compacting, with a 2" overlay. The primary objective of the proposed 2 contract is to rehabilitate the 2 mile strength of Swiftcurrent road, construction new parking facilities, and rehabilitate campground loop roads. Contract award is anticipated by August 2024. The estimated period of performance will consist of a notice to proceed in September 2024 and a fixed completion in September 2025 Estimated Price Range: $5 -$10 Million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$10,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
85
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2025

Project location map

To Be Determined, Yogo Crossing, MT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.