BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Shaw AFB, South Carolina. Working plans call for the renovation of a military facility.

"As per the Owner the Project has been cancelled. Editorial Content Team is actively seeking updated information" This notice has been cancelled due to errors in the solicitation documents.A seperate solicitation is being prepared and will be published NLT 9 April 2024. ALCON: This requirement is being reposted as FA480324B0006. Please refer to the new solicitation for submission instructions. Bid due date will be 25 April 2024. A new solicitation and price worksheet will be attached. The new solicitation should be posted on or about 25 Mar 2024. Project Title: B1990 Elevator Modernization Constrn. Contr. No. N62467- 92-C-0905 Spec No: 06-92-0905 This requirement is to modernize the elevator for the control tower (building 1990) on Shaw Air Force Base, South Carolina. Work for this project includes replacing the existing control system, furnishing and installing a new overspeed governor and governor rope as well as car and counterweight roller guides. All work shall be performed in accordance with the Statement of Work. This award will be evaluated under Lowest Price Technically Acceptable (LPTA) procedures. The evaluation factors for technical acceptability include providing recent and relevant experience within the last 3 years. Additionally, your proposal shall include experience with open-access elevators with five (5) or more stops. These factors must be included in your proposal in order to be determined technically acceptable. A site visit is scheduled for this requirement and will take place on 7 March 2024 at 1:00 PM EST at building 1990 (Control Tower). If you require base access to Shaw AFB, please contact the COR for this requirement, Mr. David Adams at david.adams.57@us.af.mil, no later than COB 29 February 2024. Questions will be due by COB 12 March 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Military

$500,000.00

Public - Federal

Renovation

4

21

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
43
Bidding Soon
611
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2024

September 30, 2024

img_map_placeholder

411 Polifka Dr, Shaw AFB, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.