BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in El Monte, California. Completed plans call for site work for a water / sewer project.

Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid. Late attendees will not be permitted to bid. Major components of Project Work consist of removal and disposal of two 10,000- gallon double wall underground storage tanks which are split into four chambers. Removal and disposal of four 500-gallon aboveground storage tanks, ten 55-gallon steel drums containing gasoline. Removal of all associated fueling system items including but not limited to dispensers, electrical conduit/wires, sump, air/water units, all underground fuel piping, vent, vent pipes, pumps, concrete fuel island. Contractor is to obtain all required permits as well as conduct any and all testing required by the Los Angeles County Public Works Environmental Programs Contractors State License Classification required to bid Project is A and HAZ Availability of Funds: Award of this contract is subject to the availability of funds through the States normal budget process and/or transfer of funds to the Department of General Services through the Architecture Revolving Fund. The bids shall include all Work pursuant to the Drawings and Project Manual, and Addenda as may be issued prior to bid opening date. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be made available immediately after the bid opening is completed and it will be emailed to invited bidders Executive Order N-6-22: The Bidder must be advised of Executive Order N-6-22 Russia Sanctions. On March 4, 2022, Governor Gavin Newsom issued Executive Order (EO) N-6-22 regarding Economic Sanctions against Russia and Russian entities and individuals. Economic Sanctions refers to sanctions imposed by the U.S. government in response to Russias actions in Ukraine, as well as any sanctions imposed under state law. By submitting a bid, Bidder represents that it is not a target of Economic Sanctions. Should the State determine Bidder is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Bidders bid any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State. Submit on Lump Sum basis with allowances as set forth in Bid Forms. DVBE: Participation in Disabled Veterans Business Enterprises (DVBE) program may be required for this project. Refer to Project Manual Document 00 21 00, Project Manual Document 00 22 10 and Bid Forms for requirements. Bidders are advised to commence the required DVBE procedures immediately upon receipt of drawings and project manual. Project Number : 000000000010925 DVBE Bid Incentive: The DVBE Incentive program is being applied on this project. Refer to Project Manual Document 00 21 00, Article 18.5. Small Business Preference: Refer to Project Manual Document 00 21 00, Article 5.5 Non-Small Business Subcontractor Preference: Refer to Project Manual Document 00 21 00, Article 5.6 Bonds: Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price. Non-Discrimination Program (Gov. Code, Section 12990): Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction. Labor Code: Pursuant to Labor Code, Section 1774, the Contractor to whom the contract is awarded, and any subcontractor under him, shall pay not less than the specified general prevailing rates of per diem to all workers employed in the execution of the contract. Pursuant to Labor Code, Section 1770 et seq., the Department of Industrial Relations (DIR) has ascertained general prevailing rate of per diem wages in the locality in which the work is to be performed. Copies of the general prevailing rate of per diem wages are available from the Department of Industrial Relations, Labor Statistics & Research Division, P.O. Box 420603, San Francisco, CA 94142, (415) 703-4780 A five percent (5%) small business preference will be granted to Bidders certified as Small Business in accordance with Section 1896 et. Seq., Title 2, California Code of Regulations. All bids shall be accompanied by the following forms of bidders security: Bidders Bond, cashiers check, certified check or cash. Bidders Bond shall be executed by an admitted surety insurer, authorized to issue surety bonds in the State of California. Bond and checks shall be made payable to the director of the Department of General Services. The security shall be in an amount equal to at least 10 percent of the amount bid. A bid shall not be considered responsive unless one of the forms of bidders security is enclosed with it. Copies of the general prevailing rate of per diem wages are on file at DGS principal office, which shall be made available to any interested party on request. Note that when the general prevailing rate of per diem determination shows an expiration date (noted by a double asterisk), to expire during the term of the contract, the Contractor must call or write the DIR to obtain the new rates and incorporate them in this contract for submittal of bid. The Contractor is responsible to comply with the Labor Code Sections and general prevailing rate of per diem determinations, including all the guidelines and the fine print in the general prevailing rate of per diem determinations. Refer to Project Manual Document 00 72 00, General Conditions of the Contract for Construction. Labor Compliance Monitoring and Enforcement: This project is subject to monitoring and enforcement by the Department of Industrial Relations (DIR), Compliance Monitoring Unit. All Contractors and subcontractors, regardless of tier, shall be required to comply with the Monitoring and Enforcement Program, including, but not limited to, contractor registration, submittal of electronic certified payroll reports directly to the DIR as applicable and cooperation with on-site monitoring by DIR personnel. Refer to Labor Code 1771.4 et seq. and the General Conditions of the Contract for Construction, Document 00 72 00, Article 3.3.3 for more information States estimated cost: $311,10000. The term of this project is 151 calendar days. The States Project Director is Sabina Wiley at 279-799-3936.

Post-Bid

Water / Sewer

$311,100.00

Public - State/Provincial

Site Work

8

16

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
106
Bidding Soon
2,256
All Active Projects
1,006
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 16, 2024

February 8, 2024

img_map_placeholder

9528 Telstar Ave, El Monte, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.