This is a service / maintenance or supply contract in Fitchburg, Wisconsin. Contact the soliciting agency for additional information.
This project consists of designing and installing a new storm sewer culvert under Fitchrona Road north of Lacy Road upstream of Goose Lake. In 2017, the construction includes installation of a new culvert at ~$20k. Conceptual planning of future improvements is anticipated to be ~$10k in 2017. In 2018, the planning and final design is anticipated to be ~$30k, to be split between the City of Fitchburg (~1/3), Town of Verona (~1/3) and grant funding (~1/3). Construction would likely take place in 2019, estimated at ~$150k to be split by Fitchburg (~1/3), Town of Verona (~1/3), and grant funding (~1/3). 2018-2027 CIP Update: Revised funding source for the planning/design/engineering to split evenly between the Town of Verona and Fitchburg Stormwater Utility with no grant funding. 2019-2028 CIP Update: Town did not budget for this study and has been delayed for one year. City to begin process in 2018 with the funds allocated by the utility. Construction is moved to 2020 pending grant and Town of Verona funding availability. Construction costs increased 10% for 2019 to reflect current bids and 3% for 2020. 2020-2029 CIP Update: Coordination with the Town of Verona has not been completed due to staffing issues. The following items have been pushed back: culvert installation ~$25k (2020), planning and final design ~$35k (2020), and construction ~$169,500 (2021). Rebudget project due to multi-year delays. 2021-2030 CIP Update: Delayed two years from 2021-2023. 2022-2031 CIP Update: Delayed one year from 2023 to 2024. 2022 Budget Amendment (expected): Added $100,000 for design and planning funded 20% by stormwater rates and 80% by Congressional District Spending Appropriation (grant). 2023-2032 CIP Update: Delayed construction project form 2024 to 2025 to correspond with reconstruction of Fitchrona Road. Updated construction cost to reflect annual indexing. 2024-2033 CIP Update: Moved project from 2025 to 2024 to correspond with/before reconstruction of Fitchrona Road. Updated construction cost from $184,500 to $500,000 to reflect opinion of probable construction cost and contingency. Shifted funding sources to reflect primarily funded by grant. Staff will apply for grant funding (i.e.. FEMA BRIC) which could cover a portion of the project. 2025-2034 CIP Update: Construction of new facilities delayed from 2024 to 2025. Construction cost was increased to reflect revised design. The 2024-2033 CIP has $500,000 for construction of new facilities in year 2024, which will be carried over to 2025. $400,000 of the funding is sourced from grants/donations per the current CIP. Congressionally Directed Spending (EPA Community Grant) was intended to be the source of the $400,000. The EPA grant will instead be used to fund the Flooding North of Dunn's Marsh project in 2024. A portion of construction will be funded by the Town of Verona. MMSD may also contribute to this project but the funding amount is not known, and their contribution is not guaranteed. 2026-2035 CIP Update: Rebudgeted the project as none of the prior authorized funding was included in the carryover to 2025. Construction to occur in two phases. Majority of construction costs to be spent in 2026. Previously authorized funding and included in carryover: None The project is included in the City's 2026-2035 Capital Improvement Program (CIP) As of June 25, 2026, further details have not yet been identified *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$600,000.00
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2024
Multiple Locations, Fitchburg, WI
Related To This Project
Fitchburg, WI
Bid Date: Jan 17 2024
Fitchburg, WI
Bid Date: Jul 20 2021
Fitchburg, WI
Bid Date: Feb 02 2024
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Dec 22 2023
Fitchburg, WI
Bid Date: Jan 10 2025
Fitchburg, WI
--
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Dec 08 2023
Fitchburg, WI
--
Fitchburg, WI
Bid Date: Jun 16 2020
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.