BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pipeline in Josephine, Texas. Working plans call for site work for a pipeline.

*As of 12/21/2023, this project has been cancelled per Addendum 1.* The Community Independent School District is soliciting proposals from qualified contractors to perform gas line work for the new Elementary school in Josephine, Texas. This project involves the installation of 4" High Density Poly IP gas main. A. Project generally consists of the following: 1. Installation of approximately 1000 feet of 4-inch high density poly IP gas main by approved bore and/or open cut method. 2. Installation of service lines within the limits of project. (approximately 1). 3. By-pass will be required on tie-in. Location of gauges will be determined in field. 4. Contractor will notify FCC Mark Elliott and Project Specialist Thomas Nemariam 48 hours prior to starting work. B. Atmos Energy Corporation will: 1. Obtain all construction permits prior to construction 2. Identify all LP DRS locations within 2,500 feet of tie-in operations. 3. Determine LP DRS locations have had LP sensing lines previously mapped and documented. If not sensing lines within 2,500 foot radius will be required to be identified prior to any LP tie-in activities. Per LP sensing line Scope of Work. 4. Provide inspection- COMPANY may opt to provide inspection through a third party. C. Contractor will: 1. Provide necessary supervision, labor, equipment, and material to complete project. 2. Be required to soft dig all LP sensing lines on identified DRS locations within 2,500 foot radius of tie-in activities prior to tie-in of newly installed facilities. Per LP sensing line Scope of Work. 3. Install monitor/verification taps on all mains prior to any tie in activities. Note: These taps serve two purposes. First they are placed on the main to verify the line is the correct line (insuring exposed main is an Atmos Energy line and the correct pressure for the line you're working on) and second they are installed on the upstream and downstream side of any pressure control device to insure gas pressure is maintained during tie in activities. A. Taps must be installed on lines at all locations where tie in activities are to take place to insure line is an Atmos Energy line and is the correct operating pressure. B. Gauges installed on existing service risers should only be utilized when you have verified the service is tied to the main, you're working on

Final Planning

Pipeline

$2,000,000.00

Public - County

Site Work

3

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
372
Active Projects
215
Bidding Soon
4,997
All Active Projects
1,911
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 9, 2024

September 11, 2024

img_map_placeholder

1201 Cotton Gin Ct, Josephine, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.