Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2024 at 8:00 PM

Updated May 15, 2024

Renovation of a water / sewer project in Seattle, Washington. Completed plans call for the renovation of a water / sewer project.

The West Point GCCM project goals include replacing mechanical and electrical equipment at the end of its useful life incorporating new technologies and improving the plant's ability to maintain service should catastrophic events occur. The preconstruction of the overall project commences in January 2024 and is planned to end in Q1 of 2027. The overall project consists of 10 separate construction packages as listed below with work commencing in 2024 and completing near the end of 2030. Primary Tank Coating Passive Weir for Emergency Bypass, Capacity Increase Administration/Operations Center Building Seismic Upgrade Primary Effluent (PE) and Raw Activated Sludge (RAS) Pipe Restoration/Replacement Effluent Pump Station (EPS) Isolation Gate Rehabilitation Biogas Utilization Improvements Oxygen Generation System Vacuum Swing Absorption (VAS) Refurbishment Instrument and Service Air Replacement Electrical Equipment Replacement and Improvements Critical Gate Refurbishment Written comments may be submitted to Brent Anderson (206-396-9519) at brent-anderson@hoffmancorp.com and received no later than the time of the hearing.

Post-Bid

Water / Sewer

$2,000,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
269
Active Projects
117
Bidding Soon
2,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 3, 2024

February 5, 2024

Project location map

To Be Determined, Seattle, WA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed