BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a water / sewer project in Palm Desert, California. Design plans call for site work for a water / sewer project; and for paving for a water / sewer project.

Per the civil engineer, they do not have a construction date yet. The civil engineer states they have a better idea in the summer of 2024 as the design progresses. Closed solicitation has been included below for reference. ……………….. Online Q&A : Yes Q&A Deadline : 12/14/2023 4:00 PM (PST) Start/Delivery Date : 01/25/2024 Project Duration : 6-8 months CVWD's Engineering Department is requesting formal proposals from consultants to prepare final plans, specifications, right of way research, cost estimates, and construction bid phase assistance for the Sunbird Mobile Home Park and the Torres-Martinez Community Center located along Avenue 66 and Martinez Road in the unincorporated area of Riverside County located south west of the City of Coachella. The Project work scope includes utility research, survey, potholing, right-of-way research and acquisition of necessary pipeline easements (including preparation of legal descriptions and plats), geotechnical services, identification of alternatives and preferred pipeline alignments, final design documents, specifications, cost estimates, and permits for: 1. Proposed offsite improvements include a new sewer lift station, 14,100 linear feet of 8-inch and 10-inch diameter gravity sewer pipeline along portions of Echols Road, Ave 66, and Martinez Road. The 10-inch gravity main will connect to CVWD's existing 18-inch sewer system along Polk Street via an existing 12-inch VCP stub out. This system is expected to include 50-manholes. 2. A new sewage lift station would be constructed east of Sunbird Mobile Home Park, along Echols Road and Harrison Street just north of Avenue 66. From there, 1,300 linear feet of 6-inch diameter force main would be constructed along Harrison Street towards Avenue 66 to connect to the 8-inch gravity main. 3. The design effort needs to include onsite improvements and laterals needed to convey flows from the Sunbird Mobile Home Park and Torres-Martinez Community Center to the offsite sewer main. Approximately 1,175 feet of onsite pipelines for Sunbird Mobile Home Park and approximately 3,100 feet for Torres-Martinez Community Center to connect to the offsite sewer system. Onsite improvements also includes abandonment of 25 septic tanks. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$10,081,088.00

Public - County

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
45
Bidding Soon
879
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

img_map_placeholder

Multiple Locations, Palm Desert, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.