Renovation of a power facility in Silver Creek, Washington. Completed plans call for the renovation of a power facility.

This project includes the design, construction, installation and commissioning of a new controls system for the bridge crane located in the Mayfield Powerhouse. This task is to replace outdated control components with modern equipment to provide capability for smooth and precise low speed movements regardless of crane loading. The crane controls system upgrade shall include new AC electrification of the crane, new AC motors and AC motor controls as specified in these technical provisions. The contractor shall supply all materials required to complete the work required by this contract in excess of those materials to be supplied by Tacoma Power as listed in Section 01040 - Project Coordination. In all cases, the City's contract is with one (1) general contractor and it is the general contractor's responsibility to ensure all work required to provide a complete and operational system is included in their bid. When possible, the City has attempted to reference work which should be coordinated with various trades, but it is the contractor's responsibility to coordinate and schedule the work of all subcontractors, trades, and suppliers to assure the proper and timely prosecution and completion of all items of work Replace outdated control components with modern equipment to provide capability for smooth and precise low speed movements regardless of crane loading. The purpose of this project is to improve safety, performance, and reliability of the crane control system of the bridge crane in the Mayfield powerhouse. The scope is to replace outdated control components with modern equipment to provide capability for smooth and precise low speed movements regardless of crane loading. The City anticipates awarding a single design, construction, installation and commissioning contract. A design review will occur before commencing with construction. The cost of the work is expected to be around $1,500,000. The anticipated project completion date is March 2025. The contract will be for a two-year period or until the project is complete, whichever is sooner. The City reserves the right to cancel the contract for any reason, by written notice, as stipulated in the contract. Questions should be submitted to Dawn DeJarlais via email to ddejarlais@cityoftacoma.org Pre-Submittal Questions: 1/30/2024 Response to Questions: 2/2/2024 Submittal Evaluated: 2/14/2024 Interviews/presentations, on or about: 2/23/2024 Award Recommendation, on or about: March 2024 Public Utility Board/City Council Approval, on or about: March 2024 If a Bid Bond is used, the form furnished by the City must be followed; no variation from the language thereof will be accepted. The amount of the Bid Bond must be not less than five percent (5%) of the total amount bid; and, if shown in dollars and cents, the amount of said Bid Bond must be not less than the required five percent; or in lieu of dollars and cents, the bond may be completed by inserting therein, "five percent of the amount of the accompanying proposal". Bid Bonds will not be returned. Bid Bond should be submitted electronically with bid submittal. Hard copies should be postmarked no later than the submittal date. A payment and performance bond, including power of attorney, for this project is required in the amount of 100 percent of the Contract total. All interested parties had the opportunity to submit questions in writing by email to Dawn DeJarlais, Senior Buyer by January 30, 2024. The answers to the questions received are provided below and posted to the City's website

Post-Bid

Power Plant

$1,500,000.00

Public - City

Renovation

100

47

27

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
84
Bidding Soon
2,034
All Active Projects
667
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 6, 2024

April 8, 2024

March 31, 2025

img_map_placeholder

253 Hydro Ln, Silver Creek, WA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.