BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 26, 2024 at 7:00 PM

Updated August 7, 2024

Site work and paving for a bridge / tunnel in Wichita Falls, Texas. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

For Ps&e Package Questions Call: Callan Coltharp 2844 East Central Freeway Wichita Falls, Tx 76301 940/397-2074 Length: 1.9960 Mi Time for Completion: 442 Working Days For Questions Regarding a Proposal Call 512/416-2498 County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Wichita 0156-04-120 Us 82 Eb (Kell) Us 82 Br 2024(686) at Kemp Blvd Length: 0.21 Miles Wichita 0156-04-121 Us 82 Wb (Kell) Us 82 Br 2024(686) at Kemp Blvd Length: 0.21 Miles Wichita 0156-04-122 Us 82 Eb (Kell) Us 82 Br 2024(686) at Taft Blvd Length: 0.1380 Miles Wichita 0156-04-123 Us 82 Wb (Kell) Us 82 Br 2024(686) at Taft Blvd Length: 0.1380 Miles Wichita 0156-07-114 Ih 44 Nb Ih 44 Br 2024(863) at Red River Length: 0.80 Miles Wichita 0156-14-028 Bu 277a Bu 277a Br 2024(686) at Bnsf Railroad Length: 0.50 Miles TXDOT: Rehabilitate Bridge - US 82 Contractor questions on this project are to be addressed to the following individual(s): Callan Coltharp, P.E.: Callan.Coltharp@txdot.gov Cody Bates, P.E.: Cody.Bates@txdot.gov

Award

Bridges / Tunnels

$2,856,132.00

Public - State/Provincial

Paving, Site Work

86

4

2

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
31
Bidding Soon
411
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 2, 2024

April 2, 2024

Project location map

US-82, Wichita Falls, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.