Renovation of a water / sewer project in Allen Park, Michigan. Completed plans call for the renovation of a water / sewer project.

Construct Concrete Generator Foundation on Existing Slab .Install one (1) 45 KVA Generator (by others) on Newly Constructed Foundation . Install one (1) 100 AMP. Automatic Transfer Switch (by others) .Provide and install two (2) additional 20 AMP. 120 VAC circuits to supply generator battery charger and engine heater . Install RMC Conduits and Copper Conductors, coordinate any required utility shut down, coordinate start-up with generator supplier . Remove and Re-locate existing Mushroom Vent . All related work. Install one (1) 45 KVA Generator (by others) on Existing Concrete Slab . Install one (1) 100 AMP. Automatic Transfer Switch (by others) . Provide and install one (1) 100 Amp Circuit Breaker Panel and two (2) additional 20 AMP. 120 VAC circuits to supply generator battery charger and engine heater . Install RMC Conduits and Copper Conductors, coordinate any required utility shut down, coordinate start-up with generator supplier . All related work. Construct Concrete Generator Pad/Foundation . Install one (1) 45 KVA Generator (by others) on Newly Constructed Pad/Foundation . Install one (1) 100 AMP. Automatic Transfer Switch (by others) . Provide and install one (1) 100 AMP Service Entry Rated Disconnect . Provide and install one (1) 100AMP Circuit Breaker Panel and provide and install two (2) additional 20 AMP. 120 VAC circuits to supply generator battery charger and engine heater. Remove Existing Generator Receptacle, Provide and Replace with reverse Service Receptacle . Install RMC Conduits and Copper Conductors, coordinate any required utility shut down, coordinate start-up with generator supplier . All related work. All bids shall remain firm and may not be withdrawn for Ninety (90) days after the actual date of opening thereof. Construction shall start on or before April 1, 2024 All time limits for Milestones, if any, Substantial Completion, and completion and readiness for final payment as stated in the Contract Documents are of the essence of the Contract. The Work will be completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions on or before June 1, 2024 A properly completed Bid Bond, Certified Check or Cashier's Check in a sum not less than five (5) percent of the proposed amount of the proposal submitted, shall accompany each proposal as security for acceptance of the Contract by the lowest qualified bidder. Should the Contractor fail to enter into a Contract agreement with the Owner, through no fault of the Owner, he shall forfeit the entire amount of the security to the Owner. The City of Allen Park reserves the right to accept or reject any or all proposals, waive any irregularity in any proposal, and make an award of Contract in any manner, deemed in its best interest. Proposals submitted after the exact time specified for receipt shall not be considered. All inquiries shall be directed to C.E. Raines Company at telephone at 734-285-7510 or via email at: msype@charlesraines.com. CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and that OWNER will suffer financial loss if the Work is not completed within the times specified in Paragraph 4.02 above, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The parties also recognize the delays, expenses, and difficulties involved in proving in a legal or arbitration proceeding, the actual loss suffered by OWNER if the Work is not completed on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree that as liquidated damages for delay (but not as a penalty), CONTRACTOR shall pay OWNER Five Hundred and 00/100 dollars ($500.00) for each day that expires after the time specified in Paragraph 4.02 for Substantial Completion until the Work is substantially complete. After Substantial Completion, if CONTRACTOR shall neglect, refuse, or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by OWNER, CONTRACTOR shall pay OWNER Two Thousand and 00/100 dollars ($2,000.00) for each day that expires after the time specified in Paragraph 4.02 for completion and readiness for final payment until the Work is completed and ready for final payment. All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by ENGINEER as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$100,740.00

Public - City

Renovation

11

12

4

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
341
Active Projects
200
Bidding Soon
2,774
All Active Projects
1,117
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 1, 2024

April 1, 2024

June 1, 2024

img_map_placeholder

Multiple Locations, Allen Park, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.