BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Parker, Colorado. Completed plans call for site work for a playground / park / athletic field.

Reference Number 0000339829 Question Acceptance Deadline 02/23/2024 10:00 AM MT Questions are submitted online Yes, For additional information please contact Charles Ellis, Chief Procurement Officer Email: cellis@parkeronline.org 303-805-3188 The Town of Parker is seeking proposals to replace its aging irrigation controllers throughout the Town's properties. The intent is to upgrade the necessary controllers with reliable and new technology that can provide sustainable and reliable communication and be easily upgradable/ expandable to keep up with the demands of future technology. This project is considered part of a new, central control system renovation for up to (89) separate controllers located at various Town parks and facilities. The proposals should include all aspects necessary to successfully replace, program, integrate, and operate new controllers, to include but not limited to the following: A site survey for each site, controllers, installation, testing and configuration on site, initial program set-up. Continual training for a minimum of six (6) months, and any additional aspects necessary to ensure the ease and success of implementation. As necessary, install new flow sensors/hydrometers. Installation within existing cabinets, connection to existing conventional zone wires and flow sensor/ hydrometer equipment. The Town will be the project manager and make periodic inspections of the work to ensure proper installation throughout the project. The proposal must provide adequate information to ensure the success of the project and include all necessary information that may not be common knowledge to the Town. The work is intended to begin as soon as feasible for both the contractor and the Town, but not later than May 1, 2024, and must be completed no later than July 1, 2024. All work must not affect current watering needs at the time, and it is the responsibility of the awarded vendor to ensure or provide arrangements for watering should a controller not be available for watering needs. The awarded vendor must also communicate with the Town's project manager any concerns

Post-Bid

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
979
All Active Projects
410
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2024

May 7, 2024

img_map_placeholder

Multiple Locations, Parker, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.