BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Westfield, Massachusetts. Completed plans call for the renovation of a educational facility; and playground / park / athletic field.

Construction of 6 Post Tension Concrete Tennis Courts at the Westfield High School. This specification covers the application of a new wearing surface for Plexipave Tennis Courts and/or new or existing concrete tennis courts that have a sound, well-drained base of adequate thickness and stability. Surfaces should be properly sloped for good drainage, and free from cracks. The process consists of the repair of any minor depressions and cracks, followed by applications of the Plexipave System. Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions/Project Manual Appendices. Additional terms used in these Instructions to Bidders have the meanings indicated below: Issuing Office : The office from which the Bidding Documents are to be issued. City of Westfield Purchasing Department 59 Court Street, Room 101 Westfield, MA 01085 Email: n.reynolds@cityofwestfield.org Email: t.tefft@cityofwestfield.org Phone: (413) 572-6254 Fax: (413) 572-1708 SCOPE OF WORK A. Construct and maintain temporary silt fencing/ filter tube where shown on the plans and where other excavation or stockpiled material may cause erosion and sedimentation. B. Construct and maintain construction access tracking pads in locations shown on the plans. C. Temporary Seeding: Seed areas where surplus material is placed or stockpiled to provide temporary turf establishment. D. During the construction, the Engineer may direct the Contractor to install additional sediment controls for protection of drainage system at no additional cost to the Owner. E. Temporary pervious barriers using bales of hay, straw, or siltation tubes held in place with stakes driven through the bales and into the ground or sediment filter fabric fastened to a fence post and buried into the ground, shall be installed and maintained as required to check erosion and reduce sedimentation. F. Temporary vegetative cover shall be established on all unprotected areas that produce sediment, areas where final grading has been completed, and areas where the estimated period of bare soil exposure is less than 12 months. Temporary vegetative cover shall be applied if areas will not be permanently seeded by September 1. G. Construction Entrance (Anti-Tracking Pad): The construction entrances shall be located in the field. The Contractor will be responsible to maintain pad(s) (i.e. add stone, regrading, etc.) for the duration of the project. H. At the completion of the project, the Contractor shall remove and dispose of all temporary sediment and erosion controls, construction entrances, and restore all impacted areas to its original configuration. All material shall be disposed of in a proper manner in accordance with current regulatory standards and in legally acceptable disposal areas.

Award

Educational

$1,139,937.00

Public - City

Renovation

10

15

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
568
Active Projects
334
Bidding Soon
4,454
All Active Projects
1,859
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 8, 2024

March 11, 2024

July 12, 2024

img_map_placeholder

177 Montgomery Rd, Westfield, MA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.