BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Salem, Wisconsin. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

Approximate quantities of work to be expected are as follows: BASE BID 419 LF - PVC Storm Sewer (6" & 8") 3 EA - Yard Inlet 110 LF - CMP Storm Sewer (10" & 12") 472 LF - 12" Dia. RCP Storm Sewer 40 LF - 36" Dia. RCP Storm Sewer 48 LF - 42" Dia. RCP Storm Sewer 1 EA - 36" Dia. RCP End Section 2 EA - 36" Dia. RCP End Section 2 EA - 42" Dia. RCP End Section 1 EA - 48" I.D. Manhole 367 TON - Medium Rip Rap 2 EA - Sanitary Manhole Adjustment 3 EA - Sanitary Manhole Rehabilitation 360 LF - Pavement Sawing 2,335 CY - Excavation 12,000 SY - Pulverizing Pavement 915 TON - 1 1/4 " Crushed Aggregate Base 460 TON - 3" Crushed Aggregate Base 850 TON - 3/4 " Crushed Limestone Shoulder 3,280 TON - HMA Pavement (3 LT 58-28 S) 1,770 TON - HMA Pavement (4 LT 58-28 S) 22,800 LF - Marking Line Epoxy 4-Inch ALTERNATE A (Parking Lot) 45 CY - Excavation 55 TON - 1 1/4 " Crushed Aggregate Base 20 TON - HMA Pavement (3 LT 58-28 S) 10 TON - HMA Pavement (4 LT 58-28 S) 1 LS - Pavement Markings Paint 1 EA - Sign & Post Together with appurtenant construction. The electronic bid form will be available for completion beginning Wednesday, January 24, 2024. Est. Value: $ 1,410,000.00 All bidders must file a "Bidders Proof of Responsibility Form" with the Village Engineer on or before 3:00 p.m. on January 25, 2024. The Village of Salem Lakes reserves the right to reject any or all bids received, or to accept any bid which may be in the best interest of the Village of Salem Lakes. QUESTIONS ABOUT THIS PROJECT PLEASE CONTACT: LEN J. ROECKER, P.E., P.L.S. SALEM LAKES VILLAGE ENGINEER The Contract Documents, including plans and specifications, are on file and available for inspection at the Office of the Village Clerk, 9814 Antioch Road (STH 83) Salem, WI 53168. Proposals are solicited by the Village of Salem Lakes, hereinafter known as the Owner, for the 2024 Street & Utilities Improvement Program in the above described locations. Prospective bidders should visit the sites of the proposed work which will be performed to familiarize themselves with the conditions prevailing at the locations where work will be performed. The work will include the furnishing of all labor, materials, equipment, tools, supplies, services, etc., required for the complete installation of the 2024 Street & Utilities Improvement Program. The Contractor shall perform everything required to be performed and shall provide and furnish all the labor, materials, necessary tools, equipment, expendable and otherwise, and all utility and transportation services required to perform and complete in workmanlike manner all of the work required for the 2024 Street & Utilities Improvement Program in the Village of Salem Lakes, all in strict accordance with the Contract Drawings and Specifications including any and all addenda prepared by R. A. Smith, Inc., Consulting Engineers, acting in these Contract Drawings as the "Engineer," which Contract Drawings and Specifications are made a part of the Contract, and in strict compliance with the Contractor's Proposal and the other sections of the Contract Documents shall do everything required by this contract and other documents constituting a part thereof

Award

Roads / Highways

$714,736.00

Public - City

Paving, Site Work

30

8

17

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
199
Bidding Soon
4,084
All Active Projects
1,560
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 31, 2024

April 1, 2024

August 24, 2024

img_map_placeholder

Multiple Locations, Salem, WI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.