Published January 29, 2025 at 7:00 PM

Updated November 20, 2025

Site work and paving for a civil project in Salem, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

A certified check or bid bond payable without condition to the Village of Salem Lakes in an amount not less than five percent (5%) of the bid shall be submitted with each bid as a guarantee that if the bid is accepted a proper contract and bond will be executed and filed within ten (10) days after the acceptance of the bid. If such bidder fails to execute and file such contract and bond, the amount of the check or bid bond shall be forfeited as liquidated damages. \ No bid shall be withdrawn after the opening of bids without the consent of the Village of Salem Lakes for a period of sixty (60) days after the time of opening bids. Each bidder agrees upon submission of bid that if the same be accepted within said time period, he shall be bound by the terms of acceptance hereinafter contained. \ The 294th Avenue improvement portion of the contract is a 2024-2025 Wisconsin Local Road Improvement Program (LRIP) Municipal Street Improvement Project (MSILT). \ The Village of Salem Lakes reserves the right to reject any or all bids received, or to accept any bid which may be in the best interest of the Village of Salem Lakes. Each successful bidder will be required to furnish a satisfactory performance bond in the sum of the full amount of the contract. \ Approximate quantities of work to be expected are as follows: BASE BID \ 1 EA - Test & Seal Lateral Connection \ 4 EA - Manhole Grouting \ 80 EA - Grout \ 6 EA - Sanitary Manhole Rehabilitation \ 958 LF - Pavement Sawing \ 2,501 CY - Excavation \ 8,996 SY - Milling Pavement \ 1,238 TON - 3" Crushed Aggregate \ 2,436 TON - 1 1/4" Crushed Aggregate \ 3,117 TON - HMA Pavement (3 LT 58-28 S) \ 2,149 TON - HMA Pavement (4 LT 58-28 S) \ 310 TON - 3/4" Crushed Aggregate Shoulder \ 1580 LF - RCP Storm Sewer \ 13 LF - PVC Storm Sewer \ 4 EA - Inlet Median 1 \ 4 EA - File 29 Catch Basin \ 6 EA - Storm Manhole \ 1 EA - 30" Dia. RCP End Section \ 12 TON - Medium Rip Rap \ ALTERNATES \ 4 EA - Sanitary Manhole Rehabilitation \ 33 LF - Pavement Sawing \ 787 CY - Excavation \ 7,870 SY - Milling Pavement \ 604 TON - 3" Crushed Aggregate \ 1,155 TON - 1 1/4" Crushed Aggregate \ 1,635 TON - HMA Pavement (3 LT 58-28 S) \ 1,031 TON - HMA Pavement (4 LT 58-28 S) \ 141 TON - 3/4" Crushed Limestone Shoulder \ 10 LF - Remove & Replace Concrete Curb & Gutter \ 48 LS - Route & Crack Seal \ Together with appurtenant construction. All bidders must file a "Bidders Proof of Responsibility Form" with the Village Engineer on or before 3:00 p.m. on January 23, 2025. IN: 113TH STREET, 121ST PLACE, 122ND STREET, 247TH AVENUE, 251ST AVENUE, 294TH AVENUE, & VARIOUS OTHER LOCATIONS

Bid Results

Roads / Highways

$1,108,309.00

Public - City

Paving, Site Work

26

12

2

4

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
601
Active Projects
343
Bidding Soon
3,604
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 29, 2025

April 1, 2025

Project location map

Multiple Locations, Salem, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.