BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sutter Creek, California. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Professional Services for Preliminary Engineering and Final Design for Upper Ridge Road Improvements The County of Amador Department of Transportation and Public Works (County) is requesting statement of qualifications for the evaluation and proposed improvements for approximately 3.08 miles of Upper Ridge Road (approximately from Post Mile 5.25 to 8.33). For reference, beginning approximately at the Climax Road and Ridge Road intersection to SR 88 and Ridge Road intersection. Upper Ridge Road is a two-lane (one lane in each direction) major collector roadway. It consists of a mixture of mostly residential homes and a few commercial businesses. The roadway has approximately fifteen (15) road intersections and approximately ninety (90) driveways. The purpose of the project is to make repairs and safety improvements to Upper Ridge Road. Repairs are expected to consist of the rehabilitation of the pavement. The appropriate rehabilitation method is to be determined. Recommended safety improvements are to be completed with the existing roadway geometry. All proposed work is to be confined to the existing roadway footprint, with no significant expansion of the road width or change in alignment to occur. Where feasible, the County would consider adding shoulder widening with incidental earthwork within the existing right-of-way. The right-of-way varies within the project area and may need to be determined in questionable locations. The County anticipates that a categorical exemption will be processed as a Section 15301 Existing Facilities, Class 1 if the shoulders are not widened. However, the County would like the proposals to include environmental services e.g. cultural, if a full depth restoration is recommended. The County anticipates the selected Consultant will be available and ready to perform the work by late February 2024 and desires the Consultant complete the required deliverables by early August 2024. The Consultant shall propose all required work to evaluate this segment of Ridge Road and provide feasible solutions. The current engineering budget is approximately $200,000. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
35
Bidding Soon
1,166
All Active Projects
500
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 10, 2025

img_map_placeholder

Ridge Rd & Climax Rd, Sutter Creek, CA

Related To This Project


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.