BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2025 at 8:00 PM

Updated October 8, 2025

Site work for a water / sewer project in Sutter Creek, California. Completed plans call for site work for a water / sewer project.

As of October 7, 2025, the previous solicitation has been awarded to a design team. Information regarding a timeline for bidding and construction has not been determined. -------------------------------------------------------------------------- The Amador Water Agency (AWA) seeks to obtain the services of a qualified engineering consultant to perform the design of the "Tanner WTP Flow Control & Reliability Improvements (TAN 1B.1)" project, for the Tanner Water Treatment Plant, in Sutter Creek, CA. The existing Tanner Water Treatment Plant (WTP), does not have sufficient reliable treatment or backwash recycling capacity to meet the needs of its existing customers and commitments, nor can it reliably meet the permitted WTP capacity of approximately 6 MGD. To provide for reliable water production needs, with the largest unit out of service, and address the capacity restrictions at the Tanner WTP and backwash recycling unit, the Tanner WTP Flow Control & Reliability Improvements (TAN 1B.1) Project is proposed, as described in the Capacity Study. This Project proposes to replace and install numerous automated valves, flow meters, piped sections, installation of a third recycling tank for decanting backwash water, upgrades to the water treatment plant, upgrades to the existing backwash pumping and recycling units to allow operation of the added tank, backwash and sludge return to waste upgrades, upgrades to the electrical systems and controls for the plant, fencing, and pneumatic upgrades, among other improvements. The Agency reserves the right and intends to negotiate the final scope of work, personnel participation, and cost proposal before entering into the contract. The method of Contractor Selection has not been Determined at this time.

Award

Water / Sewer

$500,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
43
Bidding Soon
1,958
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 25, 2025

Project location map

Multiple Locations, Sutter Creek, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.