BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 2, 2025 at 7:00 PM

Updated March 3, 2025

Renovation of an educational facility in Kenosha, Wisconsin. Conceptual plans call for the renovation of a educational facility.

Update:https://www.wisconsin.edu/capital-planning/download/reference/9.0_PKS_WyllieHallRenovationCompletion.pdf Wyllie Hall Renovation Completion (Levels L1/L2/L3) Project is included Wisconsin System - Administration Fiscal Year 2025-2031 Page No 6 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- https://www.spartnerships.com/pipeline/current/pipeline.html The University of Wisconsin at Parkside (UW-Parkside) will use $35.3 million to renovate three levels of a historical education facility to resolve maintenance issues, replace key utility systems and rebuild infrastructure. Construction is expected to begin in May 2026. Wyllie Hall is a 52-year-old building with several utility and infrastructure systems that have exceeded their useful life expectancy. The university will complete work that was not finished during the project's first phase, prioritizing Levels 1, 2 and 3 and the roof. The project will replace the current roofing system with a durable rubber roofing system. After installation, UW-Parkside will consider installing photovoltaic solar arrays on select roof sections. The replacement roof will incorporate existing electrical conduits, mechanical equipment curbs and other roof appurtenances. The university will replace the mechanical, electrical, telecommunications and plumbing infrastructure distribution systems. Plans also include replacing suspended acoustical ceiling systems, lighting fixtures, louvers, vents and modifying and relocating sprinkler system heads. The project will integrate direct digital controls with the building's automation system to replace existing pneumatic controls. UW-Parkside will renovate the building's restrooms and replace all fixtures and floor drains to meet current accessibility standards. Plans include replacing and reconfiguring the library book and media ranges on all three levels to be ADA accessible. The university will also replace and terminate network cabling into closets that will be connected to emergency power. The project will replace the University Police's radio transmitters, repeaters, equipment and central hub. As part of the project, the university will relocate the administrative and service units in Tallent Hall to Level 3 of Wyllie Hall. Plans include reducing that level's library space to accommodate the new units. In addition, UW-Parkside will reconfigure, modify and replace the administrative elevator to provide additional stops in the building. _______ The first phase of the project (17E1Q) replaced the main building mechanical, electrical, and plumbing equipment; main building distribution vertical risers; and branch distribution wholistically on Levels D2 and D1 and partially on L1. Project work in this project includes the following wholistically on building levels L2, L3, and campus administration area and any portion of L1 not previously completed: replacing branch mechanical, electrical, telecommunications, and plumbing building infrastructure distribution; replacing all suspended acoustical ceiling systems, lighting fixtures, louvers, and vents; and modifying and relocating sprinkler system heads as required to accommodate the new ceiling grid and dimensions. It is also the sole responsibility of the submitting A/E firm to ask for clarification of meaning or intent of any of the documents or requirements up to a period of 5 business days prior to the submittal deadline, to allow for a reasonable time to research a response, if necessary, and respond to the A/E firm prior to the submittal deadline. Please direct your questions via e-mail to: Audra Jervey audra.jervey@wisconsin.gov The method of Contractor Selection has not been Determined at this time.

Conceptual

Educational

$23,300,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
468
Active Projects
223
Bidding Soon
3,281
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2026

Project location map

900 Wood Rd, Kenosha, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.