BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Santa Barbara, California. Completed plans call for site work for a water / sewer project.

License Requirements A Liquidated Damages $100/Calendar Day Project Duration 65 Calendar Days from NTP Remove and replace deteriorated piles, pile caps, stringers and deck boards. The Waterfront Department shall supply all materials for this work unless otherwise noted. The Contractor is responsible for giving the Waterfront Inspector needed materials list in a timely manner, at least three days prior to work beginning. No excess materials or waste materials shall be removed from premises without authorization from the Waterfront Maintenance Superintendent. -Remove Piles -Drive Bearing Piles -Replace Pile Caps -Stringer Replacement - Replace Deck Boards -Provide Sound Protection for Stearns Wharf Night Work In accordance with Civil Code 9550, if the bid exceeds $25,000, the Successful Bidder shall furnish within ten (10) consecutive calendar days after written Notice of Award, a Payment Bond in an amount equal to one hundred percent (100%) of the total amount of the bid. Question Deadline 02/13/2024 at 12:00 PM PT Online Q&A Yes Bidders are hereby notified that a Payment Bond in the amount of 100% of the bid total will be required from the successful bidder for bids exceeding $25,000. The bond must be provided within 10 calendar days from notice of award and prior to the performance of any work. The bond must be signed by the bidder and a corporate surety, who is authorized to issue bonds in the State of California. CERTIFICATE OF INSURANCE Contractor must submit to the contracted department within 10 calendar days of an order, AND PRIOR TO START OF WORK, certificates of Insurance naming the City of Santa Barbara as Additional Insured in accordance with the attached Insurance Requirements.

Award

Water / Sewer

$219,104.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
28
Bidding Soon
544
All Active Projects
235
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 21, 2024

img_map_placeholder

Multiple Locations, Santa Barbara, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.