BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 2, 2024 at 7:00 PM

Updated February 21, 2024

Renovation of a clubhouse / community center in Santa Barbara, California. Completed plans call for the renovation of a clubhouse / community center.

Remove existing lights/fixtures & Discard all debris / old fixtures, Installing new LED lights (may involve moving office furniture around in order to get to the existing light fixtures) SCOPE OF WORK Ground Level LED Lights Installation o Remove existing lights/fixtures & Discard all debris / old fixtures o Installing new LED lights (may involve moving office furniture around in order to get to the existing light fixtures). o LED lights list below - 1. 137 of Ceiling light fixtures - example 1 ft. x 4 ft. 50W Dimmable White Integrated LED Edge-Lit Deco Flat Panel Flush Mount Ceiling Light with CCT 2. 7 of Round light of the small space / closet - 15 in. 22.5-Watt White Integrated LED 1650 Lumens Edge-Lit Round Flat Panel Flush Mount Ceiling Light 3. Contractor to investigate if permits are required during walk-thru and obtain any required permits Bids shall be accompanied by a bid guarantee in the form of a money order, cashier's check, certified check or bank draft payable to the Sponsor, U.S. Government bonds, or a satisfactory bid bond executed by the bidder and acceptable sureties in an amount equal to five (5%) of the bid. Contracts awarded under these contract documents in excess of $150,000 shall be required to post a performance bond or equivalent security and a Payment bond for contracts over $25,000. No bid may be withdrawn for a period of thirty (30) days after bid opening PATH Santa Barbara reserves the right to postpone, accept or reject any and all bids as PATH Santa Barbara deems in its own best interest, subject to the terms and provisions of the contract documents. For any additional information please contact Charlie Chang at CharlieC@epath.org or 858-289-9361 All labor is required to be paid at a rate not less than the greater of the current Federal Davis-Bacon Prevailing Wage and the State of California Prevailing Wage Determination made by the California Director of Industrial Relations (published with bid documents)

Post-Bid

Clubhouse / Community Centers

$5,000,000.00

Public - Federal

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
84
Bidding Soon
956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2024

March 20, 2024

Project location map

816 Cacique Street, Santa Barbara, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.