BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 10, 2024 at 8:00 PM

Updated April 11, 2024

Site work and paving for a mixed-use development in Morton Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Proposed Improvement is Officially Known as the Village of Morton Grove 2024 Concrete Replacement Program. This Project Will Be Financed by Village of Morton Grove Funds. The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required for earth excavation, sidewalk removal, sidewalk construction, sidewalk removal and replacement, driveway removal and replacement, curb and gutter removal and replacement, and pavement patching at various locations throughout the village and all other incidental work necessary to complete this improvement according to the Contract Documents. The right to waive any irregularity and to reject any or all bids is reserved to the President and Board of Trustees of the Village of Morton Grove. The Village reserves the right to reject any or all bids, to waive any irregularities and/or, to disregard any informality on the bids and bidding when, in its opinion, the best interest of the Village will be served by such action. General questions regarding the Contract Documents should be directed to Mr. Chris R. Tomich, P.E., Village Engineer, Public Works Department, via fax to (847) 965-9511. All detailed questions concerning the actual bid specifications should be forwarded in writing via fax no less than five business days prior to the scheduled bid opening date. A bid deposit in an amount not less than 5% of the bid amount must accompany each bid. The bid deposit shall be in a form of Bid Bond (per the attached form), certified check drawn on, or a cashier's check issued by, a responsible Bank or Trust Company with a minimum of ten million dollars net assets and made payable to the Village. Question Deadline 02/16/2024

Award

Roads / Highways

$336,350.00

Public - City

Paving, Site Work

3

9

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
278
Bidding Soon
3,632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 16, 2024

April 1, 2024

Project location map

Multiple Locations, Morton Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.