BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work for a water / sewer project in Tiffin, Ohio. Design plans call for site work for a water / sewer project.

As of November 20, 2025, this is a multi-year design project that is just exiting the planning phase and entering into the design phase. Construction is not scheduled to begin until the earliest 2029.  That being said, we will not have plans or a contractor until closer to that date as well. An engineer has been selected, and this project is in the design phase. Engineer firm information and a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The City of Tiffin is soliciting letters of interest for engineering planning for an Inflow Reduction Project within CSO Basins 18, 19, 23, 33 & 37 as identified within the City of Tiffin's Integrated Long Term Control Plan Update dated January 31, 2017. The contract for this project will require the selected consultant to manage all facets of planning for this project including but not limited to CCTV, field investigation, smoke testing, dye testing and development of a Basis of Design Report that will include field investigation results with design alternatives and construction estimates. The consultant will also be required to attend monthly progress meetings throughout the planning process. A copy of the City of Tiffin's Integrated Long Term Control Plan Update dated January 31, 2017 can be obtained from the City of Tiffin Engineer. The City of Tiffin will authorize the consultant to begin providing services by April 2024. The City requests the submission of the Basis of Design Report by December 31,2024. The City of Tiffin intends to apply for WPCLF funding for this project, thus, the project needs to comply with WPCLF program regulations. The City of Tiffin will directly select a consultant based upon the Letter of Interest (LOI), which should be no more than ten pages in length (not including the cover letter). Letters of Interest shall include the following: 1) Provide a list of the prequalification's obtained by the prime consultant 2) List significant subconsultants, their prequalification categories and the percentage of work to be completed by each subconsultant. 3) List the Project Manager and other key staff members, including key subconsultant staff. Include project engineers for important disciplines and staff members that will be responsible for the work, and the project responsibility of each. Address the experience of the key staff on similar projects. 4) Describe the capacity of your staff, and their ability to perform the work in a timely manner, relative to the present workload, and the availability of the assigned staff. 5) Provide a description of your Project Approach, not to exceed two pages in addition to the 10 page total. Questions should be directed to Matt Watson, P.E., P.S., CPESC City Engineer for the City of Tiffin. The Consultant Selection Rating Form can be obtained from the City Engineer by email at mwatson@tiffinohio.gov

Design

Water / Sewer

$1,000,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
186
Active Projects
84
Bidding Soon
1,478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.