Site work for a water / sewer project in Tiffin, Ohio. Design plans call for site work for a water / sewer project.
As of November 20, 2025, this is a multi-year design project that is just exiting the planning phase and entering into the design phase. Construction is not scheduled to begin until the earliest 2029. That being said, we will not have plans or a contractor until closer to that date as well. An engineer has been selected, and this project is in the design phase. Engineer firm information and a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: The City of Tiffin is soliciting letters of interest for engineering planning for an Inflow Reduction Project within CSO Basins 18, 19, 23, 33 & 37 as identified within the City of Tiffin's Integrated Long Term Control Plan Update dated January 31, 2017. The contract for this project will require the selected consultant to manage all facets of planning for this project including but not limited to CCTV, field investigation, smoke testing, dye testing and development of a Basis of Design Report that will include field investigation results with design alternatives and construction estimates. The consultant will also be required to attend monthly progress meetings throughout the planning process. A copy of the City of Tiffin's Integrated Long Term Control Plan Update dated January 31, 2017 can be obtained from the City of Tiffin Engineer. The City of Tiffin will authorize the consultant to begin providing services by April 2024. The City requests the submission of the Basis of Design Report by December 31,2024. The City of Tiffin intends to apply for WPCLF funding for this project, thus, the project needs to comply with WPCLF program regulations. The City of Tiffin will directly select a consultant based upon the Letter of Interest (LOI), which should be no more than ten pages in length (not including the cover letter). Letters of Interest shall include the following: 1) Provide a list of the prequalification's obtained by the prime consultant 2) List significant subconsultants, their prequalification categories and the percentage of work to be completed by each subconsultant. 3) List the Project Manager and other key staff members, including key subconsultant staff. Include project engineers for important disciplines and staff members that will be responsible for the work, and the project responsibility of each. Address the experience of the key staff on similar projects. 4) Describe the capacity of your staff, and their ability to perform the work in a timely manner, relative to the present workload, and the availability of the assigned staff. 5) Provide a description of your Project Approach, not to exceed two pages in addition to the 10 page total. Questions should be directed to Matt Watson, P.E., P.S., CPESC City Engineer for the City of Tiffin. The Consultant Selection Rating Form can be obtained from the City Engineer by email at mwatson@tiffinohio.gov
Design
Water / Sewer
$1,000,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 4, 2029
Multiple Locations, Tiffin, OH
Related To This Project
Tiffin, OH
Bid Date: Mar 07 2024
Tiffin, OH
Bid Date: Mar 12 2024
Tiffin, OH
Bid Date: Apr 09 2024
Tiffin, OH
Bid Date: Mar 28 2024
Tiffin, OH
Bid Date: May 06 2024
Tiffin, OH
Bid Date: May 16 2024
Tiffin, OH
Bid Date: Jun 06 2024
Tiffin, OH
Bid Date: Jun 18 2024
Tiffin, OH
Bid Date: Feb 15 2024
Tiffin, OH
--
Tiffin, OH
Bid Date: Feb 08 2024
Tiffin, OH
--
Tiffin, OH
Bid Date: Feb 15 2024
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.