Site work for a water / sewer project in Milton, Vermont. Completed plans call for site work for a water / sewer project.

The Town of Milton is requesting proposals from qualified companies for upgrades to the Allen Drive Pump Station. The company's scope of work includes replacing the existing single phase submersible pumps with VFD's for single three phase conversion. No pre-bid meeting is scheduled. The Town of Milton existing pump station has 7.5 Hp Hydromatic pumps. The pump station services 34 units and sees flows of 8375 gpd on average. Onsite power is 120/240V 1 phase. The VFD's shall be installed on a panel board outside the existing panel. The VFD's should be rated for outside installation and in a NEMA rated enclosure. Pumps will be wired to Mission Controls. They must have a hydromantic breakaway fitting. Pump design point should be 120 GPM @ 57 ft TDH. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM. Questions about the project should be submitted in writing, and directed to Lisa Schaeffler at the lschaeffler@miltonvt.gov. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM No pre-bid meeting scheduled. The work for this project must be completed by June 30, 2024. The Town of Milton is requesting proposals from qualified companies for upgrades to the Allen Drive Pump Station. The company's scope of work includes replacing the existing single phase submersible pumps with VFD's for single three phase conversion. No pre-bid meeting is scheduled. The Town of Milton existing pump station has 7.5 Hp Hydromatic pumps. The pump station services 34 units and sees flows of 8375 gpd on average. Onsite power is 120/240V 1 phase. The VFD's shall be installed on a panel board outside the existing panel. The VFD's should be rated for outside installation and in a NEMA rated enclosure. Pumps will be wired to Mission Controls. They must have a hydromantic breakaway fitting. Pump design point should be 120 GPM @ 57 ft TDH Questions about the project should be submitted in writing, and directed to Lisa Schaeffler at the above email address. All questions must be submitted by Thursday, February 15, 2024 by 9:00 AM. A response to questions will be provided as an Addendum and will be posted to the Town's website. All firms must acknowledge the receipt of any addenda issued for this project

Award

Water / Sewer

$35,800.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
209
Active Projects
91
Bidding Soon
1,543
All Active Projects
617
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.