BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Meeker, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Notice is hereby given for the invitation to bid on the Town of Meeker Crack Fill Street Project, which includes cleaning cracks and furnishing and installing approximately 20,000 pounds of hot-pour, Deery American Super stretch 974, in the Town of Meeker. Description The work of this section shall consist of furnishing and installing a pre-approved rubberized crack filler in properly prepared cracks in bituminous paved surfaces. Material The material shall be hot poured rubberized crack filler (Deery American 974 or equal and shall conform to the requirements of ASTM D-3407 for hot poured elastic type sealant. The sealant shall be delivered in the manufacturers sealed containers. Each container shall be legibly marked with the manufacturer's name and trade name of the material. Materials from different manufacturers other than stated above shall not be allowed. The supplier shall issue a certificate of compliance stating that the material meets the requirements of this project. Construction Requirements Equipment: Heating pots for hot poured sealant shall be an indirect double boiler type using oil heat transfer medium. The heating pot shall be capable of controlling the temperature of the sealant within the manufacturer's recommended application range. A thermometer calibrated within +/-5 degrees Fahrenheit for range of 200 to 500 degrees Fahrenheit shall be provided. The heating pot shall be capable of constantly agitating the material. All cracks larger than 1/8 inch and less than one inch in width are to be filled. Weather Limitations Sealant shall not be placed when the weather is foggy, raining, or when the surface to be sealed is damp or wet. Preparation Immediately prior to the placement of the sealant, the cracks shall be blown clean of dirt, debris, or foreign matter to a depth of at least twice the width of the crack but to a depth of no greater than the pavement thickness. Application The sealant shall be heated according to the manufacturer's recommendations, applied at the manufacturer's temperature and installed flush with the pavement surface. Immediately after the crack is filled, excess material shall be leveled off of the surface by a squeegee, a shoe attached to the applicator wand, or other suitable means. The squeegeed material shall be centered in the crack and shall not exceed 3 inches in width nor 1/16 inch above the surface of asphalt. Any crack sealant showing settling, shrinkage, or a depression in excess of 1/4 inch below the pavement surface shall be refilled. Insurance The successful bidder must maintain workers compensation and general liability insurance in the amount of no less than $1,000,000.00 during the project. The Town reserves the right to reject or accept any and all bids. Each proposal shall be reviewed and considered consistent with the provisions of the Town of Meeker Personnel Policy and Procedures Manual. For more information contact Tobey Willey, Public Works Superintendent at 970-942-7554 or Mandi Etheridge, Town Administrator, 970-878-5344.

Award

Roads / Highways

$45,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
3
Bidding Soon
91
All Active Projects
36
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2024

March 21, 2024

img_map_placeholder

Multiple Locations, Meeker, CO

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.