BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2024 at 8:00 PM

Updated August 16, 2024

Site work and new construction of a warehouse / distribution facility in Catawissa, Pennsylvania. Completed plans call for the construction of a warehouse / distribution facility; and for site work for a warehouse / distribution facility.

As of August 15, 2024, construction has commenced. All trades have been awarded. The previous solicitation is listed below for reference. Project consisting of Concrete Heavy Use Area and Waste Storage Facility, 56x296 * Roofs and Covers * Roof Runoff Controls * Underground Outlets * Subsurface Drain * Access Road This project is funded in part by the Agriculture Conservation Assistance Program (ACAP). All work must be performed according to the PA Technical Guide Standards. State prevailing wage rates apply State prevailing wage rates apply. Bid and performance bonding required. CCCD Board and/or Soil Bound, LLC reserves the right to reject any and all bids. For additional information contact: Gary Rinehimer Columbia County Conservation District 702 Sawmill Road, Suite 103, Bloomsburg, PA 17815 570-594-4495 or gary.rinehimer@columbiaccd.org The work shall be completed by 12/31/2024 *This project has been awarded and all trades have been let.

Under Construction

Warehouse / Distribution

$575,009.00

Public - County

New Construction, Site Work

14

3

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
157
Bidding Soon
2,101
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2024

April 12, 2024

Project location map

68 Rider Rd, Catawissa, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.