BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work and outdoor lighting for a bridge / tunnel in Catawissa, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.

Bridge Lighting Replacement throughout the Columbia, Northumberland, and Snyder Counties with a total of 7 sites, reconstruct concrete blisters, reset guiderail, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 42, Section 133, in Catawissa, Columbia County, State Route 2028 section 023 is located approximately 783 feet southwest of the intersection with SR 11 in South Centre Township at segment 0000 offset 0000 to approximately 783 feet northwest of the intersection with SR 339 at segment 0024 offset 0000 Mifflin Township. For State Route 42, Section 133, is located approximately 420 feet south of the intersection with SR 4002 in Montour Township at segment 0390 offset 465 to approximately 0.3 miles northeast of the intersection with SR 487 at segment 0370 offset 0089 Catawissa Township. For State Route 487, Section 126, is located approximately 69 feet southeast of the intersection with Fort McClure Blvd in Bloomsburg at segment 0230 offset 1990 to approximately 621 feet northwest of the intersection with SR 2009 at segment 0220 offset 2783 Catawissa Township, Columbia County. For State Route 11, Section 184, is located approximately 0.2 miles north of the intersection with County Line Road in Monroe Township at segment 0010 offset 0073 to approximately 0.4 miles southeast of the intersection with SR 405 at segment 0040 offset 0063 Northumberland Borough, Union County. For State Route 642, Section 040, is located approximately 82 feet east of the intersection with SR 1009 in Kelly Township, Union County at segment 0010 offset 0544 to approximately 0.4 miles west of the intersection with SR 405 at segment 0020 offset 1404 Milton Borough, Northumberland County. For State Route 642, Section 041, is located approximately 0.2 miles east of the intersection with SR 1009 in Kelly Township, Union County at segment 0010 offset 0544 to approximately 110 feet west of the intersection with SR 405 at segment 0020 offset 1404 Milton Borough, Northumberland County. For State Route11, Section 185, is located approximately 0.2\4 miles north of the SR 35 Exit ramp at segment 0260 offset 0528 to approximately 2.5 miles south of the exit ramp to SR 11 at segment 0320 offset 823, Snyder County. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Anticipated NTP: 08/31/2026 Wage Rates: Yes Required Completion: 08/25/2028 Prequalification Requirement: Yes State Type of Work: Miscellaneous Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PADOT - D3 SEDA-COG Bridge Lighting Upgrades to LED *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Sub-Bidding

Bridges / Tunnels

$2,500,000.00

Public - State/Provincial

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
414
Active Projects
223
Bidding Soon
2,881
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2026

August 31, 2026

Project location map

Multiple Locations, Catawissa, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.