BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hollidaysburg, Pennsylvania. Completed plans call for site work for a water / sewer project.

Ritchey Property Streambank Stabilization Project The project must begin on June 24, 2024, and must be entirely and adequately completed by July 24, 2024. Each successful bidder will be required to comply with the Prevailing Minimum Wage of PA Department of Labor and Industry, (Act 422 of 1961, P.L. 987 amended). The successful bidder will be required to execute contract documents. Evidence of insurance coverage as described in the bid documents must be furnished prior to issuance of a contract and the commencement of work. The District reserves the right to postpone or cancel receipt of bids, and to accept or reject any and all bids, in whole or in part of the best interest of the District will be served thereby. PROJECT DETAILS: Ritchey Property Streambank Stabilization Project is located at: Work Area 1: 40.429356, -78.437540 ( East off Route 764/US HWY 22) Work Area 2: 40.430554, -78.441077 (West off Route 764/US HWY 22) Work Area 3: 40.432318, -78.447772 (South off Mill Road, Duncansville, PA) Brief description of work includes: Log vane deflectors (multi log and single log), log framed stone deflectors, modified mudsill structures (one, two, three, five, and six sections), rock grade controls, randomly placed instream boulders, toe logs, cross logs, modified mudsills and log framed stone deflectors with extended sills, sawtooth deflectors, log cross vanes, and a rock cross vane. Brush material removed shall be taken off site for disposal. The Duncansville Research and Development Facility or other off-site disposals would be suitable locations for disposal Work for the project must begin and end as stated in the above Work Performance Timeframe, upon Execution of Agreement, unless stream conditions do not allow as determined by BCCD Staff and/or Trout Unlimited Staff. Project must be completed by July 24th, 2024.

Award

Water / Sewer

$89,886.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
35
Bidding Soon
547
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 6, 2024

June 24, 2024

img_map_placeholder

To Be Determined, Hollidaysburg, PA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.