BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Sacramento, California. Completed plans call for the renovation of a residential development.

The Housing Authority of the City of Sacramento is soliciting sealed bids from C7 Low Voltage System contractors to provide and install a "state-of-the-art" security camera surveillance systems at two of the public housing sites within the City of Sacramento. The installation shall include all equipment and labor necessary. Question Submission Deadline:March 22, 2024, 10:00am All RFI Questions must be submitted online through OpenGov The Contractor shall complete all work required under this contract within One Hundred Twenty (120) calendar days of the effective date of the contract Project Description Provision and installation of new security surveillance system at 480 Redwood Avenue & 3725 Cypress Street in Sacramento, CA. 3.2. Minimum Requirements Minimum of 3 years experience with digital camera and digital recording equipment. It will be necessary to include references to verify experience; California C-7 Low Voltage Systems and/or C-10 General Electrical contracting license; Contractor will use only trained employees that have been certified by the manufacturer as qualified installers. Prove of certification will be required. 3.3. 480 Redwood Avenue Scope of Work Scope of Work At the existing multi-family complex at 480 Redwood Avenue, Sacramento 95815, perform the following work: At Ground Floor: Remove existing Pelco surveillance cameras (32 cameras), cabling and mounts Install a total of 32 new cameras, mounts and cabling with new Digital Watchdog (DW) cameras Install new server (with monitor, keyboard and mouse) in the same location (see drawings). At Floor 2: Install cameras at 2nd floor locations specified on drawings. Cabling to be brought through existing conduit and pulled through existing drop ceilings at each floor to camera locations. Equipment List: NVR: DW-BJP2U64T Cameras: Exterior: DWC-MVA5WiAT (11 total) Interior: DWCMV85WiATW (20 total) PTZ: DWC-XPZA03Mi (1 total) Mounts: See drawings for various mounting types POE switch: Cisco CBS350-48FP-4G Contractor shall place a switch at necessary intervals as per manufacturer specifications. Consult with owner prior to placement. Monitor: 22 inch LCD Server Rack Cabinet: Star Tech Product ID: RK1833BKM All cabling to be fire riser rated (for above ceiling installation as well as through existing conduit risers). Contractor will be responsible for all cabling (identification, troubleshooting) through existing conduits, mounting in existing locations, and finish. The Scope of Work under this contract will be for the mounting of the cameras at all of these locations, and for the installation of the new NVR (server) inside existing Security Room, and connection of the camera cabling termination (point of connection) to this server. Contractor shall ensure a fully operational system before commencement of the 2-year warranty period under this contract. Contractor will provide the new DW product to allow SHRA staff the technology to view the property at all hours of the day via the client software and the ability of retaining video for up to 30 days. 3.4. 3725 Cypress Street Scope of Work Scope of Work At the existing multi-family complex at 3725 Cypress Street, Sacramento 95838, perform the following work: At Ground Floor: Remove existing Pelco surveillance cameras (28 cameras), cabling and mounts. Install a total of 28 new cameras, mounts and cabling with new Digital Watchdog (DW) cameras Install new server (with monitor, keyboard and mouse) in the same location (see drawings). At Floor 2: Install cameras at 2nd floor locations specified on drawings. Cabling to be brought through existing conduit and pulled through existing drop ceilings at each floor to camera locations. Equipment List: NVR: DW-BJP2U64T Cameras: Exterior: DWC-MVA5WiAT (11 total) Interior: DWC-MV85WiATW (17 total) Mounts: See drawings for various mounting types POE switch: Cisco CBS350-48FP-4G Contractor shall place a switch at necessary intervals as per manufacturer specifications. Consult with owner prior to placement. Monitor: 22-inch LCD Server Rack Cabinet: Star Tech Product ID: RK1833BKM All cabling to be fire riser rated (for above ceiling installation as well as through existing conduit risers). Contractor will be responsible for all cabling (identification, troubleshooting) through existing conduits, mounting in existing locations, and finish. The Scope of Work under this contract will be for the mounting of the cameras at all of these locations, and for the installation of the new NVR (server) inside existing Security Room, and connection of the camera cabling termination (point of connection) to this server. Contractor shall ensure a fully operational system before commencement of the 2-year warranty period under this contract. Contractor will provide the new DW product to allow SHRA staff the technology to view the property at all hours of the day via the client software and the ability of retaining video for up to 30 days.

Bid Results

Residential Subdivision

$132,991.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
152
Bidding Soon
2,825
All Active Projects
1,119
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 5, 2024

May 6, 2024

September 3, 2024

img_map_placeholder

Multiple Locations, Sacramento, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.