BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 3, 2024 at 8:00 PM

Updated May 4, 2024

Site work for a mixed-use development in St. Albert, Alberta. Completed plans call for site work for a road / highway; sidewalk / parking lot; and water / sewer project.

This Request for Proposals (the "RFP") is an invitation by the City of St. Albert (the "City") to prospective proponents to submit proposals for the 2024 Localized Storm Drainage Improvements. A. The Work to be undertaken is generally described as a) SCHEDULE A: ERIN RIDGE - 12MR b) SCHEDULE B: 5 KINGSBURY CRESCENT c) SCHEDULE C: ATTWOOD PARK d) SCHEDULE D: NORMAN COURT e) SCHEDULE E: EDWARD WAY The Work within the Schedules shall include, but is not limited to, the following: Removal Works - Removal and disposal of existing concrete material, asphalt and topsoil. Concrete Works - Replacement of concrete swales and concrete sidewalks Grading Works - Excavation ditches and grading of proposed areas to improve drainage Storm Works - Installation of Catch Basins and Catch Basin Leads Landscaping - Tree protection, topsoil placement, Sod installation, and any other landscape remediation required. Additional Works - Remove, store and reinstall property fence. Project Management: on a weekly basis, attend (virtual and/ or in person), participate, provide updates on health and safety, sequencing of work, construction schedule and financial updates. Stakeholder Communication: notify and advertise appropriate residents, trail users, and active transportation users of upcoming work. Direct communication is essential with affected stakeholders throughout the planned and duration of construction. Documents can be obtained from https://stalbert.bidsandtenders.ca/

Award

Roads / Highways

$371,280.00

Public - City

Site Work

11

14

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
20
Bidding Soon
561
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

May 1, 2024

Project location map

Multiple Locations, St. Albert, AB


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.