BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Hartford, Vermont. Completed plans call for the renovation of a water / sewer project.

Estimated award date 4/23/2024 Communications Regarding This Project: Please direct all communications and questions regarding this bid request to: Hartford Vermont Department of Public Works c/o Christopher Holzwarth, Project Manager 171 Bridge Street White River Junction, VT 05001 Telephone: (802) 295-3622 E-Mail: cholzwarth@hartford-vt.org PRE-BID MEETINGS: The Town shall not conduct pre-bid meetings. Questions should be submitted in writing with written responses prepared by the Town and posted on the Town's web site by the date listed in Section 1.02. Written responses will be prepared by the Town and posted on the Town's web site by the date listed in Section 1.02. SITE VISIT: Contractors can request their own site visit prior to March 15, 2024, by emailing Jeremy Delisle, Director at jedlisle@hartford-vt.org. Project Description (1) The Town of Hartford desires the staggered removal and replacement of the existing media, gravel, and internal structures in two (2) of the vertical pressure filters at the Wilder Water Treatment Plant located on Cranberry Lane in Wilder VT. The Contractor shall also regenerate the new media in the two pressure filters to original specifications. The Contractor shall carry all costs required to provide all labor, materials, equipment, appurtenances, and incidentals to remove and dispose of existing filter media and gravel, internal structures, and support gravel, provide new support gravel, internal structures and filtration media and regenerate the filter media prior to placing the filters back in service. The existing pressure filters are 8' in diameter which were furnished by Hungerford & Terry, Inc. All media and replacement parts must meet specifications set forth by Hungerford & Terry, Inc. The staggered phasing shall consist of completing one filter in FY24 (June 1, 2023 to June 30, 2024) and beginning and completing the second filter in FY25 (July 1, 2024 to June 30, 2025). The town desires the work to be done consecutively with the second filter immediately following the first filter if possible.

Bid Results

Water / Sewer

$142,000.00

Public - City

Renovation

7

11

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
60
Bidding Soon
1,038
All Active Projects
465
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

May 28, 2024

img_map_placeholder

Cranberry Ln, Hartford, VT

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.