BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Fruita, Colorado. Completed plans call for site work for a road / highway.

18 ROAD RECREATION AREA IMPROVEMENTS This is a solicitation notice for Road and Recreation Improvements in accordance with the Attachments. Pre-Bid Site Tour: A hosted tour has been scheduled for 14 May at 10:00 on the site. Meet at the North Fruita Desert Parking area. Socio-economic Categories: While this procurement remains a competitive Total Small Business Set-Aside, the BLM highly encourages and welcomes quotes from all sub-categories of small business such as Small Disadvantaged, Woman Owned, Service Disabled Veteran, HUBZone, 8a, and Indian Small Business Economic Enterprises. Important News: The Federal Highway Administration also has a project planned for 18 Road starting in Sept 2024. This will be something to consider for your schedule, accommodations and logistics. See and follow Solicitation: 6982AF24SS0009 CO FLAP MES 18(1) 18 ROAD - https://sam.gov/opp/c79bd590d1a34f1f89ab8f94aa9de142/view for more detail and an opportunity to bid on or participate in work in the same geographic area. Project Description: 1.1 PROJECT DESCRIPTION The work includes, but is not limited to; site work, road and parking area construction, precast concrete toilet supply and installation, gazebo installation, and campsite construction. 1.2 LOCATION The project is located approximately 12 miles north of the city of Fruita, CO. From Fruita, Colorado, travel north on 18 Road until you get to the existing BLM North Fruita Desert trailhead. The project location can also be found by searching "North Fruita Desert" in google maps. Web Site: https://www.recreation.gov/camping/campgrounds/274413 1.3 WORK SCHEDULE Work is not allowed from April 15 to July 15 to protect wildlife. Work is not allowed September 19-22 and October 3-6. There are large race events scheduled at the project site those dates. Work shall occur Monday - Friday, excluding federal holidays. Work shall be completed within 150 days of the Notice to Proceed. Period of Performance: 15 July - 31 December 2024 - 150 Days. Rough Order of Magnitude: $250,000 - $500,000 Basic Contracting Requirements: 1. Active Registration - www.sam.gov 2. Invoicing and Payment - www.ipp.gov - 14 Day prompt pay with progress payments 3. FAR Part 36 - Construction Provisions and Clauses 4. FAR Part 15 - Contracting by Negotiation 5. Davis Bacon Act Wages for Mesa County, CO 6. Total Small Business Set-Aside for NAICS 237990 - Size Std: $45M 7. Type of Contract - Firm Fixed Price - no changes for anything you could, should know about or reasonably forecast. 8. Award Basis - Low Price Technically Acceptable Minimum Requirements for Responsive Quote: 1. Filled in, priced, dated and signed SF1442 with acknowledgement of all amendments. 2. Schedule B filled in with prices. 3. Bid Bond - 20% of Price 4. Technical Response per Section L and M. Primary POC: Contracting Officer Robert Hall - rhall@blm.gov - 762-329-0002 Last Day for any more questions is: 31 May 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$417,649.00

Public - Federal

Site Work

34

29

9

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
5
Bidding Soon
78
All Active Projects
27
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2024

July 15, 2024

img_map_placeholder

18 Rd, Fruita, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.