BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2024 at 8:00 PM

Updated July 16, 2024

Site work and paving for a mixed-use development in Fruita, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000349480 This project consists of utility, pedestrian and roadway improvements on 19 Rd. between Highway 6 & 50 and J.2 Rd. in the City of Fruita. Work includes, but is limited to, traffic control, the modification of existing and installation of 1,250' of new domestic water line and fittings, 4,200[ of sanitary sewer line, 5,000[ of storm drain line, 2,500' of irrigation line, inlets, manholes and diversion boxes, removal of an existing canal box culvert, installation of 150' of new cast-in-place canal box culvert, stormwater BMP installation & maintenance, earthwork, grading, road reconstruction and widening, removal and replacement/resetting of fences, driveways, culverts, mailboxes, etc., installation of concrete curb ramps, traffic islands and sidewalks, and surface restoration/reseeding once underground and paving improvements are completed. A portion of the work will take place in the CDOT right-of-way at the intersection of 19 Rd. and Highway 6 & 50. The project is anticipated to have a delayed construction start of mid-November 2024 in order to avoid impact to irrigation water delivery; however, if the contractor feels that some work can take place without disruption to irrigation delivery and with a minimal amount of impact to traffic on affected roads, the City will consider allowing construction activities to commence early. You can learn more about the project here. Questions are submitted online No, All questions about the meaning or intent of the Bidding Instructions are to be submitted via email to the Project Manager (Steve Martinez, smartinez@fruita.org). Contact the Fruita Engineering Department at 970-858-3663 with any questions during the bid period. Question Deadline 05/01/2024 at 12:00 PM MT The City expects to issue a Notice of Award by the end of day on Monday, June 10, 2024 and have a signed Contract by the following week. Bonding Requirements - Bid Bond 5% - Performance Bond 2.5% - Payment Bond 2.5% The City of Fruita reserves the right to reject any or all Bids, and to waive any informalities or irregularities therein, for any reason, including past project performance.

Award

Roads / Highways

$5,815,688.00

Public - City

Paving, Site Work

126

5

5

7

Subscribe For Documents

98 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
16
Bidding Soon
121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2024

November 4, 2024

Project location map

19 Rd, Fruita, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.