BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 30, 2024 at 8:00 PM

Updated July 31, 2024

Site work and new construction of a clubhouse / community center in Fruita, Colorado. Completed plans call for the construction of a 1,000-square-foot clubhouse / community center; and for site work for a clubhouse / community center.

Reference Number 0000355568 The City of Fruita (the City) is requesting proposals from qualified contractors to build and add three (3) new offices and a new maintenance storage room (as further described below) to the existing Fruita Community Center located at 324 N. Coulson Street, Fruita, Colorado, 81521 (the Community Center). All Proposals should be for the design and construction of three (3) new offices, one (1) maintenance and storage room, and one (1) connecting hallway, all to be added to the existing Community Center. The dimensions of such build are approximately fifty feet (50') in length and twenty feet (20') in width, with the newly built area to be separated into the three (3) separate offices and one (1) maintenance and storage room. In total, the newly built area should be approximately one thousand square feet (1000 sq. ft.). City intends and desires that the newly built area be near the aquatics guard office in the Community Center and heading east. Question Deadline 07/10/2024 at 2:00 PM MT Questions are submitted online No, Questions about this RFP or the Project will be accepted, RFP Questions: MacKenzie Erickson merickson@fruita.org. All questions, inquiries, comments, or communications pertaining to this RFP or any Proposal (whether regarding the Proposal preparation or submission process, Project (defined below) specifications or scope, or otherwise) must be directed (in writing) to merickson@fruita.org. To minimize disruptions to Community Center operations (and the Community Center's pool in particular), Project construction will not be allowed to begin before September 2024. All aspects of major Project construction must be completed by May 26, 2025. Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Performance Bond 2.5 % - Payment Bond 2.5 % City reserves the right to reject any or all Proposals, to not enter the Project Contract, and to otherwise not proceed with the Project.

Bid Results

Clubhouse / Community Centers

$484,775.00

Public - City

New Construction, Site Work

3

3

142

6

Subscribe For Documents

79 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
16
Bidding Soon
121
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2024

September 2, 2024

Project location map

324 N Coulson St, Fruita, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.