BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 28, 2024 at 8:00 PM

Updated March 29, 2024

Site work and paving for a sidewalk / parking lot in Orem, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project includes the replacement and addition of concrete sidewalks, ADA ramps, and pedestrian walkways to improve pedestrian access throughout the U.V.U. campus. The base bid shall include all work and materials associated with this project as outlined in the plans and specifications. This work must be completed during Summer Break 2024. Construction Cost Estimate: $410,000.00 For questions relating to U3P, please email sciquestadmin@utah.gov. Question Deadline 03/11/2024 at 3:00 PM MT Utah Public Procurement Place (U3P) For questions regarding pre-qualification or eligibility, please email dfcmcontracts@utah.gov or call 801- 957-7186.

Bid Results

Sidewalks / Parking Lot

$427,880.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
142
Active Projects
58
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 20, 2024

May 9, 2024

Project location map

936 S 400 W, Orem, UT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.