EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Port Angeles, Washington. Design plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of January 9, 2025, this project is in the design phase. Construction should begin in early 2026. The City of Port Angeles is seeking qualified firms to perform a pedestrian crossing study along the First Street, Front Street and Marine Drive corridor which will be used to identified locations to receive and implement enhanced crossing treatments. This project has federal grant funding through the Washington State Department of Transportation's Highway Safety Improvement Program. The design of pedestrian safety enhancements within the First/Front/Marine Drive corridors at the locations identified in the crossing study are to include, but not limited to, rectangular rapid flashing beacons (RRFBs), curb extension, advanced signage, and channelization. A total of eight intersections are assumed to be part of the scope of the project, but additional crossings may be added if resources allow, following the completion of the site crossing study. The primary focus of the project is to improve pedestrian safety in the City of Port Angeles. The selected consulting firm will perform engineering study and design of the safety improvement project as well as support City staff with public meetings, right of way acquisition, open houses, and construction management. The selected firm will be responsible for all aspects of the pedestrian safety enhancements design and the PS&E package, including surveying, engineering, assistance with securing necessary R/W, completion of Environmental Documentation and any necessary permits, coordinating traffic engineering with WSDOT. Work may also include construction inspection or management during the construction phase. The PS&E package must adhere to WSDOT & City standards. Under the general direction of the City Engineer or designee, qualified firm(s) shall be responsible for, but not limited to the following tasks: o Preliminary Engineering Study and selection of Design Alternatives o Environmental Documentation & Permitting o Determination of R/W needs and R/W plan preparation if required o Coordination with WSDOT Traffic Engineers o 30% Design Package, Plans, and Estimate o Assist City with 30% Design open house/ public meeting o 60% Design Package, Plans, and Estimate o 90% Design Package, Plans, Specifications, and Estimate o Assist City with 90% Design open house/ public meeting o Final Bid Package, 100% Construction Plans, and Specifications o Bid support and construction management The City of Port Angeles reserves the right to retain the services of the successful firm for any subsequent phase (RW, CN) associated with this project. Questions Due: Thursday, March 21st, 2024 by 5:00 p.m. PST. The City will not respond to any inquiries submitted after this date/time For further information, please contact Jonathan Boehme at 360.417.4803 or jboehme@cityofpa.us Estimated Project Cost $1,280,000 The method of Contractor Selection has not been Determined at this time.

Design

Sidewalks / Parking Lot

$1,280,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
55
Bidding Soon
997
All Active Projects
370
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2026

img_map_placeholder

Multiple Locations, Port Angeles, WA

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.