EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 6, 2024 at 8:00 PM

Updated May 7, 2024

Site work and paving for a mixed-use development in Morton Grove, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Director of Public Works reserves the right to refuse to issue Plans, Specifications and Proposals to any person, firm, or corporation that he considers to be unqualified. The right to waive any irregularity and to reject any or all bids is reserved to the President and Board of Trustees of the Village of Morton Grove. All contracts for the construction of Public Works are subject to the Illinois Prevailing Wage Act (820 ILCS, 130/1 et seq.). General questions regarding the Contract Documents should be directed to Mr. Chris R. Tomich, P.E., Village Engineer, Public Works Department, via fax to (847) 965-9511. All detailed questions concerning the actual bid specifications should be forwarded in writing via fax no less than five business days prior to the scheduled bid opening date. The proposed improvement is officially known as the Village of Morton Grove 2024 PAVEMENT MARKING PROGRAM. This project will be financed by Village of Morton Grove funds. The Work included in this Contract shall consist of furnishing all the materials, labor, equipment and incidentals required for pavement marking services and all other incidental work necessary to complete this improvement according to the Contract Documents. START DATE: July 29, 2024 COMPLETION DATE/WORKING DAYS: August 9, 2024

Award

Roads / Highways

$46,708.00

Public - City

Paving, Site Work

3

9

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
128
Bidding Soon
2,417
All Active Projects
944
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 15, 2024

July 29, 2024

img_map_placeholder

Multiple Locations, Morton Grove, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.