BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2024 at 8:00 PM

Updated May 25, 2024

Site work for a sidewalk / parking lot in Cheboygan, Michigan. Completed plans call for site work for a sidewalk / parking lot.

Cheboygan County is accepting material and labor proposals for parking lot sealcoating, crack-sealing and re-striping at the Cheboygan County Building Complex located at 870 South Main Street Cheboygan, Michigan 49721 1. Bidder must measure and verify parking lot dimensions for seal coat, crack seal and re-stripping material and labor cost. 2. Prepare parking lot for application of sealcoating, crack sealing and re-striping. 3. Apply crack sealing, seal coating and re-striping paint. 4. Complete project clean-up. The County can reject all or any portion of bids. All Bidders shall inspect parking lots and verify material and quantities needed to complete project prior to bidding. In a sealed envelope marked "Cheboygan County Building Complex Parking Lot Sealcoating" Contract will be awarded by April 23, 2024. The County reserves the right to reject any or all bids, to waive irregularities in the bid, or to select other than the low bid, as may be in the best interest of the County.

Award

Sidewalks / Parking Lot

$35,600.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
16
Bidding Soon
188
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2024

May 3, 2024

Project location map

870 S Main St, Cheboygan, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.